10 MW Tangka/Manipi Hydro Electric Power Plant

CDM-4021 ↗

#237of 1935 in Renewable energy#3of 33 in Indonesia#145of 1459 in CDM (UNFCCC)#84of 806 in AMS-I.D

6.2/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A 10 MW grid-connected hydro project in Indonesia using the standard AMS-I.D methodology, with additionality confirmed by TÜV NORD CERT via a combined test and a jurisdictional grid emission factor of 0.64 tCO₂/MWh. The project is a straightforward renewable electricity avoidance activity with low reversal risk, though a baseline-method discrepancy between the validation and monitoring reports and 13 closed corrective action requests introduce moderate uncertainty. Several key parameters (FNRB, usage rates, CORSIA/CCP status) are absent from the extracted record.

Red Flags

  • Baseline method is recorded as 'project' in the 2011 validation report but 'jurisdictional' in the 2017 monitoring report — an unexplained inconsistency that could affect the validity of the emission factor applied.
  • 13 Corrective Action Requests were raised during verification, indicating recurring documentation or MRV issues, although all were subsequently closed.
  • Grid emission factor of 0.64 tCO₂/MWh is anchored to 2009 data and no updated or reassessed value is found in the extracted record.

Credit Vintages

IssuedRetiredAvailable
2012
18,728018,728
2013
37,037037,037
2014
30,899030,899
2015
31,380031,380
2016
27,881027,881
2017
30,485030,485
Total176,4100176,410

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversals reported

Leakage

0% deduction, justified as negligible

Baseline

Method contradiction across documents

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D. Grid Connected Renewable Electricity Generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents