10 MW Tangka/Manipi Hydro Electric Power Plant
#237of 1935 in Renewable energy#3of 33 in Indonesia#145of 1459 in CDM (UNFCCC)#84of 806 in AMS-I.D
Audit Analysis
A 10 MW grid-connected hydro project in Indonesia using the standard AMS-I.D methodology, with additionality confirmed by TÜV NORD CERT via a combined test and a jurisdictional grid emission factor of 0.64 tCO₂/MWh. The project is a straightforward renewable electricity avoidance activity with low reversal risk, though a baseline-method discrepancy between the validation and monitoring reports and 13 closed corrective action requests introduce moderate uncertainty. Several key parameters (FNRB, usage rates, CORSIA/CCP status) are absent from the extracted record.
Red Flags
- Baseline method is recorded as 'project' in the 2011 validation report but 'jurisdictional' in the 2017 monitoring report — an unexplained inconsistency that could affect the validity of the emission factor applied.
- 13 Corrective Action Requests were raised during verification, indicating recurring documentation or MRV issues, although all were subsequently closed.
- Grid emission factor of 0.64 tCO₂/MWh is anchored to 2009 data and no updated or reassessed value is found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 18,728 | 0 | 18,728 | |
| 2013 | 37,037 | 0 | 37,037 | |
| 2014 | 30,899 | 0 | 30,899 | |
| 2015 | 31,380 | 0 | 31,380 | |
| 2016 | 27,881 | 0 | 27,881 | |
| 2017 | 30,485 | 0 | 30,485 | |
| Total | 176,410 | 0 | 176,410 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals reported
0% deduction, justified as negligible
Method contradiction across documents
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →