100 MW Bundled Wind Power Project In Anantapuram, Andhra Pradesh

VCS-1985 ↗

6.1 / 10
Integrity
6.9
Transparency
5.8
Claim Safety
6.1
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the issuance record.

missing Baseline reassessment timing is not stated, and leakage is only described as negligible rather than quantified.

Transparency

verified The monitoring period is clearly stated for 2021-01-01 to 2022-12-31, and the issuance record reports total verified reductions equal to the claimed amount.

missing The project lacks a stated usage monitoring method, and the emissions reduction figure is contradicted by an earlier document.

Claim Safety

verified The project is an avoidance project under ACM0002 with a project baseline and no CORSIA eligibility, which reduces some dual-claim risk.

missing The verified emissions reduction total is inconsistent across documents, and leakage justification is qualitative rather than quantified.

Documentation

verified Seventeen documents were used, the VVB is named, and the issuance record is recent.

missing Extraction confidence is only medium, and several safeguard-related items were contradicted by earlier records.

Detailed Analysis

Integrity

The issuance record states that additionality was verified by VKU Certification Pvt. Ltd. using an investment test, and it reports no material findings. The project uses ACM0002 with a project baseline, but the last baseline reassessment is not stated and leakage is only described as negligible rather than quantified. No reversal events are reported, which is consistent with a wind avoidance project, but the absence of a buffer pool figure leaves permanence documentation incomplete.

Transparency

The monitoring period is clearly identified as 2021-01-01 to 2022-12-31, and the issuance record shows 144,048 tCO2e claimed and 144,048 tCO2e verified. However, the record does not state the usage monitoring method, and the extraction set includes a contradiction with an earlier verified total of 52,079 tCO2e. That inconsistency reduces confidence in the public-facing MRV trail even though the latest issuance document is more authoritative.

Claim Safety

Claim safety is helped by the project being a renewable electricity avoidance activity under a recognized methodology, with no CORSIA eligibility and no CCP status stated. Still, the emissions reduction figure is inconsistent across documents, and the leakage treatment is qualitative rather than a quantified deduction. Because the later issuance record is the most specific and authoritative for issued credits, it is privileged over the earlier figure, but the contradiction still lowers confidence.

Documentation

Documentation is reasonably broad, with 17 documents used, a named VVB, and a recent issuance date of 2023-10-30. The extraction confidence is only medium, which suggests at least one key document was not fully legible, and several items such as buffer pool, baseline reassessment, and usage monitoring method are not stated in the extracted record. Earlier documents also conflict with the later issuance record on safeguards and verified reductions, which weakens documentation reliability.

Overall

I privileged the 2023-10-30 issuance record over earlier documents because it is the most recent and directly tied to issued credits, so it is the best source for the verified total and the final safeguard status. The main contradiction is the emissions reduction total, where the later record shows 144,048 tCO2e while an earlier document shows 52,079 tCO2e; this was treated as a reliability issue rather than a reason to replace the issuance figure. Earlier documents also conflict on FPIC, safeguards, benefit sharing, and grievance mechanism, so those items are credited only cautiously despite the later record indicating they were addressed.

Audit Analysis

This is a registered VCS wind project with VVB-confirmed additionality and no reported material findings, which supports a moderate integrity profile. However, the record contains a material contradiction on verified emissions reductions and several key items are not fully stated, which weakens confidence in the documentation and claim safety.

Project Description

This project involved the installation of 50 wind electric generators in Anantapuram District, Andhra Pradesh. Guttaseema Wind Energy Company Private Limited and Vayuputhra Energy Private Limited set up 40 and 10 generators, respectively, to generate electricity that is sent to the grid via a local substation. The public comment period for this project was open from November 11 to December 11, 2019.

Red Flags

  • The verified emissions reduction figure conflicts across documents: the later issuance record shows 144,048 tCO2e verified, while an earlier document shows 52,079 tCO2e.
  • Leakage treatment is only described as negligible, with no quantified deduction, and several safeguard items are contradicted by earlier documents.

Credit Vintages

Issued Retired Available
2018
54,996 0 54,996
2019
59,643 10,680 48,963
2020
48,427 33,934 14,493
2021
67,230 0 67,230
2022
76,818 0 76,818
Total 307,114 44,614 262,500

Cosa migliorerebbe questo punteggio

  • Publish a reconciled emissions reduction table explaining why the earlier 52,079 tCO2e figure differs from the later 144,048 tCO2e issuance value.
  • Add explicit documentation for leakage treatment, baseline reassessment timing, buffer pool treatment, and the monitoring method for electricity usage or generation.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project with no reversal events reported

Leakage

Negligible leakage stated, but not quantified

Baseline

Project baseline stated, reassessment timing missing

Safeguards

Safeguards present, but earlier records conflict

Double-claim

Not CORSIA-eligible and no CCP approval stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti