Skip to main content
ScoredGCCIndiaRegistry: RegisteredACM0002

100 MW solar project in Karnataka

Developer: Amplus Tumkur Solar Energy One Private Limited

GCC-479 ↗

#2523of 4038 in Renewable energy#1194of 2267 in India#194of 232 in Global Carbon Council (GCC)#1809of 2748 in ACM0002

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.0 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A 100 MW solar project in Karnataka with a jurisdictional baseline and VVB-confirmed investment additionality, but undermined by ten material findings (three critical limitations and seven corrective action requests) that were never formally tracked as required corrective actions. No monitoring data or verified emissions reductions are available, and a CORSIA-eligibility contradiction between the PDD and verification report introduces dual-channel risk.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Pilot phase only (2021–2023)

    Eligible only for the pilot phase: not usable for the current 2024–2026 phase.

    Source: registry label

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-09-27

Credit Vintages

Issuance data not yet available — check back soon.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →