5.3/ 10
Integrity
6.8
Transparency
3.8
Claim Safety
5.8
Documentation
3.2

Audit Analysis

A 10 MW biomass power plant in India registered under CDM with a solid combined additionality test confirmed by the VVB and a jurisdictional baseline, but the available record contains only validation-stage documents with no monitoring reports, no verified emissions data, and a low extraction confidence rating. The ERR figures in the PDD and validation report differ by a factor of roughly seven, which is consistent with a per-crediting-period versus lifetime split but still reflects a documentation inconsistency. Feedstock sustainability and carbon content data are absent, leaving a notable gap for a biomass project.

Red Flags

  • No monitoring reports or verified emissions data are available despite the crediting period running from September 2019 to September 2026; the project is well into its first crediting period with zero verified output in the extracted record.
  • The PDD reports a total ERR of 398,993 tCO₂e while the validation report states 56,999 tCO₂e for the same date (2019-11-21); although the ratio (~7×) is consistent with a lifetime versus single-CP split, the discrepancy was not explicitly reconciled in the documents.
  • Feedstock sustainability and carbon content testing are not stated in any available document, which is a material gap for a biomass energy project.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted data.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Energy substitution, no reversal risk

Leakage

0% deemed negligible, appropriate for grid displacement

Baseline

Jurisdictional, reassessed 2019

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents