10MW Photovoltaic Plant in Dubai, UAE
#1062of 1935 in Renewable energy#6of 9 in United Arab Emirates#792of 1459 in CDM (UNFCCC)#343of 806 in AMS-I.D
Audit Analysis
A 10 MW solar PV project in Dubai verified under CDM with a jurisdictional baseline and VVB-confirmed additionality, but the record is marred by eleven material findings covering baseline development, monitoring plan completeness, and PDD deficiencies. The ERR figures show a contradiction between reporting periods, and several key MRV parameters (FNRB, usage monitoring method) are absent from the extracted record. Overall a moderate-quality project with notable documentation gaps.
Red Flags
- Eleven material findings (CARs) in the verification record cover baseline development steps, monitoring plan transparency, PDD boundary definition, and environmental impact description — indicating systemic documentation weaknesses at validation.
- Contradiction in baseline method: the 2023 monitoring report states a jurisdictional baseline while an earlier monitoring report references a project-specific baseline; the more recent report is privileged but the inconsistency undermines confidence in baseline robustness.
- Leakage justification is inconsistent across documents: the 2012 validation report describes leakage as 'deemed negligible' while the 2023 monitoring report states it was 'quantified' — the 0% deduction is defensible for a solar PV project but the shifting rationale is a transparency concern.
- Grid emission factor of 0.5152 tCO2/MWh is fixed to the 2011 value with no evidence of periodic updating across the 7-year crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 10,635 | 0 | 10,635 | |
| Total | 10,635 | 0 | 10,635 |
Risk Indicators
VVB-confirmed (AENOR)
Avoidance-type, no reversals
0% deduction, shifting rationale
Jurisdictional but method contradicted
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →