Skip to main content
CDMSolarMauritiusAMS-I.D

10MW solar PV based power generation by Helios Beau Champ Limited in Mauritius

CDM-10543 ↗

#465of 1935 in Renewable energy#300of 1459 in CDM (UNFCCC)#163of 806 in AMS-I.D

5.8/ 10
Integrity
5.2
Transparency
6.5
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A 10 MW solar PV project in Mauritius displacing grid electricity, verified under CDM with a jurisdictional baseline and VVB-confirmed additionality. The project delivered roughly 92% of its pro-rata expectation for the first monitoring period, but five corrective action requests—particularly the use of an expired standardized baseline and a DC-vs-AC capacity discrepancy—raise moderate concerns about the robustness of the credit quantity. Documentation is adequate but shows quality-control weaknesses that were flagged and presumably resolved before issuance.

Red Flags

  • Corrective Action Request (CAR 04) flagged use of an expired standardized baseline (ASB0019) rather than current grid emission factor data from CEB, undermining baseline currency
  • Corrective Action Request (CAR 01) identified discrepancies in project capacity (DC vs AC) and PLF values, which directly affect the credit quantity calculation
  • No grievance mechanism or FPIC process is documented in the available record, leaving community-safeguard coverage unverified

Credit Vintages

IssuedRetiredAvailable
2021
17,575017,575
Total17,575017,575

Risk Indicators

Additionality

VVB-confirmed test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, appropriate for solar PV

Baseline

Jurisdictional but expired ASB flagged

Safeguards

Mentioned but no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents