This 11.35 MW bundled renewable energy project in India has a confirmed investment-test additionality and a jurisdictional baseline, but is undermined by a seven-fold discrepancy between the PDD's claimed emissions reductions (145,614 tCO₂e) and the VVB-validated figure (20,802 tCO₂e), eight material findings with corrective actions, and a complete absence of monitoring data or verified credits. The project's data reliability and transparency are significantly below acceptable thresholds.

Red Flags

  • PDD claims 145,614 tCO₂e over the crediting period while the validation report validates only 20,802 tCO₂e — a 7× over-claim in the original project design document
  • Eight material findings (four critical, four corrective) in the validation report, including outdated CEA database, inadequate sensitivity analysis, and unresolved stakeholder concerns on local employment and land use
  • Leakage justification recorded as 'not addressed' in the validation report, despite a 0% deduction being applied
  • No monitoring reports, verified ERR, or monitoring period data found in any available document
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable or incomplete

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

renewable tech lowers risk

Leakage

0% deduction but justification 'not addressed' in validation

Baseline

Jurisdictional grid EF (0.97704, 2014 CEA)

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in any document

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents