12 MW Small Scale Mini Hydel Power Project by M/S Balaji Energy Pvt. Ltd.

UCR-149 ↗

#3of 433 in Universal Carbon Registry (UCR)#488of 806 in AMS-I.D

4.3/ 10
Integrity
5.0
Transparency
3.0
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 12 MW small-scale mini-hydro project in Andhra Pradesh registered under the UCR voluntary registry, using the well-established AMS-I.D methodology with a jurisdictional baseline and a reasonable 0% leakage deduction. However, the available record consists solely of a Project Design Document; no verification report, monitoring report, or VVB identification was found, leaving additionality, verified emissions reductions, and CORSIA/CCP eligibility entirely unconfirmed.

Red Flags

  • No additionality test type or VVB confirmation found in the available PDD; the AMS-I.D methodology requires an investment or barrier test, but no evidence of its completion is present in the extracted record.
  • No verified emissions reduction figure is available to cross-check against the 37,843 tCO₂e claimed over the 2014–2021 crediting period, making over- or under-crediting impossible to assess.
  • Only a single document (the PDD dated May 2022) was used; no verification report, monitoring report, or VVB identification appears in the record.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not found in available PDD

Permanence

Hydro project – inherently low reversal risk

Leakage

0% deemed negligible – appropriate for hydro

Baseline

Jurisdictional method stated; reassessment timing not stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents