12 MW Wind Electricity Generation Farm at Radhapuram by M/s Surana Industries Limited
#627of 975 in India#916of 1459 in CDM (UNFCCC)#387of 806 in AMS-I.D
Audit Analysis
A 12 MW CDM wind project in India using a standard jurisdictional grid baseline and VVB-confirmed investment additionality test. The core methodology is sound, but the validation report identified 14 material findings spanning GHG calculation inconsistencies, financial analysis errors, and procedural gaps, all requiring corrective action. Significant monitoring and verification data are absent from the available record, limiting confidence in actual delivery.
Red Flags
- 14 material findings at validation including inconsistencies in GHG emission factor and baseline emission values across PDD sections, indicating calculation errors in the original ERR estimate
- No verified ERR or monitoring period data available in the extracted record, making it impossible to confirm actual credit delivery against the 267,960 tCO2e lifetime claim
- Low extraction confidence across the document set, with one of seven source documents unidentifiable, reducing reliability of the evidence base
- Stakeholder consultation documentation had issues with venue, attendance records, and a discrepancy in excavation depth responses, raising minor safeguards concerns
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Deemed negligible, reasonable for wind
Jurisdictional grid EF, standard for CDM
Mentioned but consultation records had issues
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →