13.2 MW Wind Mill Power Project in Theni district of Tamil Nadu, by JISL-India
#314of 975 in India#430of 1459 in CDM (UNFCCC)#217of 806 in AMS-I.D
Audit Analysis
A standard 13.2 MW CDM wind project in Tamil Nadu using the AMS-I.D methodology, with additionality confirmed by TÜV NORD CERT via an investment test. The verification report identified ten material deficiencies in the PDD (metering accuracy, WTG configuration, financial assumptions, stakeholder consultation), all of which required corrective action. The project delivered roughly 79% of its pro-rata emission reduction expectation for the first monitoring period, indicating no over-crediting, but a contradiction in baseline classification between the validation and monitoring reports warrants caution.
Red Flags
- Ten material findings in the verification report, including incorrect WTG configuration (7 vs 6 selling to grid), metering accuracy class change not reflected in PDD, and missing environmental consents and stakeholder consultation records
- Baseline method contradiction: the validation report (Nov 2012) classifies the baseline as 'project' while the monitoring report (Jul 2013) classifies it as 'jurisdictional' — the jurisdictional reading is privileged as more recent and consistent with AMS-I.D, but the discrepancy undermines confidence in baseline documentation
- No buffer pool percentage, reversal event history, or FNRB value found in any available document, leaving permanence and MRV robustness partially unverified
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 13,780 | 0 | 13,780 | |
| Total | 13,780 | 0 | 13,780 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional but contradicted in validation report
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →