13.25 MW Wind Power Generation By Rmtl, In Kutch, Gujarat
Score Breakdown
Integrity
missing baseline method not stated (no project baseline or recent reassessment found in available documents)
verified additionality confirmed by the VVB (validation report)
Transparency
verified VVB named (LGAI Technological Center, S.A.) and monitoring period documented (monitoring report, 2012–2016)
missing contradictory and inconsistent ERR figures between documents (validation report 2021 vs monitoring/validation 2009)
Claim Safety
missing leakage justification inconsistent: earlier monitoring report deemed leakage negligible (2009) but later monitoring report states leakage not addressed (2021)
verified project not CORSIA‑eligible (project record states CORSIA not eligible), reducing one double‑claim pathway
Documentation
verified multiple evidence documents available (monitoring report and validation report; n_docs_used = 6)
missing many corrective actions required listed in verification (CAR 2.1–6.1), and baseline/method gaps remain; extraction confidence is only medium
Detailed Analysis
Integrity
The verification report confirms additionality and a named VVB (LGAI/Applus+) which supports baseline/additionality credibility. However, no baseline method is stated in the available record and leakage treatment is described as not addressed in the later monitoring report (2021). Multiple corrective actions were required in verification, indicating material weaknesses. These factors lower robustness on additionality, baseline validity and leakage.
Transparency
Project-level transparency is mixed: a monitoring period (2012–04–01 to 2016–03–30) and a named VVB are present (monitoring report, validation report), and verified ERR is reported. But there are clear contradictions between documents on total ERR claimed/verified and on safeguards/leakage, and extraction confidence is medium, reducing trust in reported numbers.
Claim Safety
CORSIA eligibility is explicitly false (good), which reduces one double-claim risk. Nonetheless, the inconsistent ERR figures (39,541 vs 81,011 tCO2e across documents) and unresolved leakage justification increase over‑crediting risk. FN/RB and usage monitoring are not documented, further elevating claim risk.
Documentation
There are multiple supporting documents (monitoring and validation reports; n_docs_used = 6) and the monitoring report is recent (2021-04-30). However, the extraction confidence is medium and many corrective actions were required by the verifier, suggesting the documentation is incomplete or of limited reliability. Key items such as baseline method and buffer pool percentage are not stated.
Overall
I privileged the more recent validation/monitoring documents (validation report dated 2021-05-24 and monitoring report 2021-04-30) over older 2009 documents because they are later and should supersede earlier figures. Specifically, for total ERR claimed/verified I used the 81,011 tCO2e figure from the 2021 validation report as the current reported value. For leakage and safeguards I treated the 2021 monitoring report (which states leakage not addressed and safeguards mentioned) as the authoritative recent record. These contradictions and the medium extraction confidence reduce the overall score to reflect data reliability and potential over‑crediting; if the contradictions are not resolved, the project remains moderately risky and scores remain low–moderate.
Audit Analysis
The project has some positive signals (VVB confirmation of additionality, named VVB, monitoring period and verified ERR), but important gaps and contradictions reduce confidence. Baseline methodology, leakage treatment, and several corrective actions are missing or inconsistent across documents, creating over‑crediting and data‑reliability risks.
Project Description
This project generates clean energy to combat greenhouse gas emissions by installing nine wind turbines with a total capacity of 13.25 MW. The majority of the electricity produced is exported to the state grid, while a portion is utilized by the project proponent's unit.
Red Flags
- Contradictory ERR figures between validation and older documents (39,541 vs 81,011 tCO2e).
- Leakage not consistently addressed (earlier report deems negligible; later report states not addressed).
- Multiple corrective actions required in the verification record.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 1,997 | 1,997 | 0 | |
| 2009 | 3,503 | 3,503 | 0 | |
| 2012 | 18,723 | 18,723 | 0 | |
| 2013 | 19,188 | 19,188 | 0 | |
| 2014 | 21,265 | 21,265 | 0 | |
| 2015 | 19,946 | 19,946 | 0 | |
| 2016 | 1,889 | 1,889 | 0 | |
| Total | 86,511 | 86,511 | 0 |
Cosa migliorerebbe questo punteggio
- Publish or clarify the baseline method and most recent baseline reassessment, including methodology references and calculations.
- Resolve contradictions by issuing an updated monitoring/validation package that reconciles ERR figures, provides a clear leakage assessment/deduction, and documents closure of all corrective actions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB confirmed but test unspecified
no buffer info; reversal risk unclear
not properly addressed
baseline method not stated
inconsistently documented
CORSIA no, CCP status unknown
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →