"14.65 MW Wind Power Project" in Maharashtra by BF Utilities Ltd.
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a project-based baseline under AMS-I.D, which is a positive sign for CDM wind.
missing Leakage treatment is inconsistent between the validation report and the PDD, and reversal risk is not addressed in the extracted record.
Transparency
verified The monitoring and crediting periods are stated, and the VVB is identified as DNV Climate Change Services AS.
missing Total verified and claimed emission reductions are not stated in the extracted record, and the leakage rationale is not consistently documented.
Claim Safety
verified The project is a wind project under CDM with VVB-confirmed additionality, which reduces some over-crediting concern.
missing The contradiction on leakage justification and the absence of verified issuance figures create uncertainty about the robustness of the claimed reductions.
Documentation
verified Four documents were used, including a validation report and PDD, and the extraction confidence is medium rather than low.
missing The validation report lists several clarifications on metering, data archiving, and emergency preparedness, showing that the original documentation was incomplete.
Detailed Analysis
Integrity
The validation report confirms additionality was verified by the VVB, and the project uses a project-specific baseline under AMS-I.D, which supports the core CDM design. At the same time, leakage is not consistently documented: the validation report says it was not addressed, while the PDD says it was deemed negligible, so I privileged the validation report because it is the independent assurance document and adjusted the score downward. Reversal risk is also not addressed in the extracted record, which is less critical for wind than for land-use projects but still leaves a gap.
Transparency
The project documents identify the VVB and provide the monitoring and crediting period, which helps traceability. However, total claimed and verified emission reductions are not stated in the extracted record, and the leakage rationale is inconsistent across documents. The validation report also shows that several monitoring details had to be clarified through corrective actions, which limits transparency.
Claim Safety
Claim safety is moderate because the project is a renewable wind installation with VVB-confirmed additionality and a CDM methodology. Still, the contradiction on leakage treatment creates uncertainty about whether the PDD or the validation report should be relied on; I privileged the validation report because it is the higher-priority independent assessment. The absence of verified issuance totals in the extracted record also makes it harder to judge over-crediting risk.
Documentation
Documentation is reasonably complete but not strong: four documents were used, and the extraction confidence is medium. The validation report lists several clarifications, including missing meter accuracy information, missing meter-point details, and data archiving language that had to be added in the revised PDD. That suggests the file was usable but not fully polished at the validation stage.
Overall
Overall, this is a mid-range CDM wind project with a solid additionality signal and a standard renewable baseline, but the evidence package has reliability issues. The main contradiction is on leakage: the validation report says it was not addressed, while the PDD says it was negligible; I gave more weight to the validation report because it is the independent VVB document and because the contradiction points to documentation weakness. The project also had multiple monitoring-related clarifications, which keeps the score below a strong-investment grade profile.
Audit Analysis
This is a CDM wind project with VVB-confirmed additionality and a project-specific baseline, which supports a moderate integrity profile. However, leakage treatment is inconsistent across documents, and the validation report records several meter/data-archiving clarifications that were only resolved through corrective actions, which weakens confidence in the documentation and claim safety.
Project Description
Status: Registered Type: PA Methodology: AMS-I.D. Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 22.577 ktCO2e/yr Reductions 2nd period: 27.929 ktCO2e/yr
Red Flags
- The validation report says leakage was not addressed, while the PDD reportedly treated it as negligible; this inconsistency lowers reliability.
- The validation report raised multiple monitoring and metering clarifications, including missing meter accuracy details and no check meters, even though corrective actions were later added.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 164,030 | 0 | 164,030 | |
| 2009 | 24,014 | 0 | 24,014 | |
| 2010 | 46,249 | 0 | 46,249 | |
| 2012 | 32,410 | 0 | 32,410 | |
| 2013 | 36,882 | 0 | 36,882 | |
| Total | 303,585 | 0 | 303,585 |
Cosa migliorerebbe questo punteggio
- Provide a consistent, document-level explanation of leakage treatment and reconcile the PDD with the validation report.
- Publish the verified emission reduction totals and complete monitoring evidence, including meter specifications, archiving provisions, and any issuance records.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal treatment stated
Leakage rationale inconsistent
Project baseline, reassessment not stated
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →