14MW MIRAE ASSET PV(photovoltaic) power plant bundling project
#638of 1935 in Renewable energy#6of 24 in South Korea#431of 1459 in CDM (UNFCCC)#218of 806 in AMS-I.D
Audit Analysis
A 14 MW solar PV bundling project in South Korea under CDM with a jurisdictional baseline and VVB-confirmed investment additionality test. The verification process surfaced seven corrective actions and one comment, several of which materially affected the additionality calculation (incorrect IRR tariff, missing CDM-consideration evidence, unaddressed national renewable-energy policies). The project is a straightforward grid-displacement avoidance activity with no inherent reversal risk, but key monitoring data (verified ERR, usage monitoring method) are absent from the extracted record.
Red Flags
- Seven corrective actions and one comment were raised during validation, including an incorrect electricity tariff used in the IRR calculation (2008 average instead of the 2006 decision-time tariff) and missing evidence of CDM benefit consideration prior to project start
- National renewable-energy promotion policies were not addressed in the additionality demonstration (CAR 3), weakening the robustness of the investment test
- Verified ERR for the monitoring period is not present in the extracted record, preventing independent confirmation of actual emissions reductions
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 11,097 | 0 | 11,097 | |
| Total | 11,097 | 0 | 11,097 |
Risk Indicators
VVB-confirmed but 7 CARs corrected the investment test
Solar PV avoidance – no inherent reversal risk
0% deemed negligible – appropriate for grid displacement
Jurisdictional grid EF (0.6096, 2007)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →