Skip to main content
CDMWindIndiaACM0002

15.2 MW wind energy project in Madhya Pradesh by Manganese Ore (India) Limited.

CDM-3350 ↗

#639of 1935 in Renewable energy#315of 975 in India#432of 1459 in CDM (UNFCCC)#496of 1287 in ACM0002

5.5/ 10
Integrity
6.8
Transparency
3.8
Claim Safety
6.5
Documentation
3.5

Audit Analysis

A straightforward 15.2 MW CDM wind project with a well-supported investment-test additionality assessment and an appropriate jurisdictional grid baseline. However, the available record is limited to the 2011 validation report; no monitoring reports, verified credit figures, or safeguards documentation were found, and extraction confidence is low, leaving significant evidence gaps on delivery and compliance.

Red Flags

  • No monitoring reports or verified credit figures found in the extracted record — actual delivery against the 271,490 tCO2e lifetime claim cannot be confirmed
  • Minimum extraction confidence is low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
  • Safeguards documentation is sparse: FPIC and grievance mechanism are not stated in any available document
  • Grid emission factor contradiction between the validation report (0.9062 tCO2/MWh) and a financial document (906.2, likely kgCO2/MWh) — a unit discrepancy that, while explainable, signals inconsistent record-keeping

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, negligible for grid wind

Baseline

Jurisdictional grid EF, appropriate

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents