15.2 MW wind energy project in Madhya Pradesh by Manganese Ore (India) Limited.
#639of 1935 in Renewable energy#315of 975 in India#432of 1459 in CDM (UNFCCC)#496of 1287 in ACM0002
Audit Analysis
A straightforward 15.2 MW CDM wind project with a well-supported investment-test additionality assessment and an appropriate jurisdictional grid baseline. However, the available record is limited to the 2011 validation report; no monitoring reports, verified credit figures, or safeguards documentation were found, and extraction confidence is low, leaving significant evidence gaps on delivery and compliance.
Red Flags
- No monitoring reports or verified credit figures found in the extracted record — actual delivery against the 271,490 tCO2e lifetime claim cannot be confirmed
- Minimum extraction confidence is low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
- Safeguards documentation is sparse: FPIC and grievance mechanism are not stated in any available document
- Grid emission factor contradiction between the validation report (0.9062 tCO2/MWh) and a financial document (906.2, likely kgCO2/MWh) — a unit discrepancy that, while explainable, signals inconsistent record-keeping
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, negligible for grid wind
Jurisdictional grid EF, appropriate
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →