15 MW Bundled grid-connected wind electricity generation project in Radhapuram Taluk of Tirunelveli District in Tamil Nadu, India

VCS-314 ↗

6.5 / 10
Integrity
6.2
Transparency
6.8
Claim Safety
5.9
Documentation
7.4

Score Breakdown

Integrity

verified The verification/monitoring record reports additionality confirmed by the VVB using an investment test and no material findings or corrective actions.

missing Leakage is not addressed in the monitoring report and baseline reassessment timing is not stated, increasing over-crediting risk.

Transparency

verified Monitoring period and claimed vs verified ERs are provided and match in the monitoring record (71,419).

missing Conflicting ER figures across validation reports and unclear leakage treatment reduce MRV clarity.

Claim Safety

verified Uses a standard small-scale grid-connected renewable methodology (AMS I.D) with a stated grid emission factor (0.927).

missing CORSIA and CCP status are not stated and contradictory ER figures elevate greenwashing/over-crediting risk.

Documentation

verified Multiple document types are available (PDD, validation, monitoring, issuance) with high extraction confidence and 11 documents used.

missing Contradictions between older validation and newer monitoring on safeguards/FPIC/grievance and between 2023 validation reports on ERs indicate reliability issues.

Detailed Analysis

Integrity

The monitoring record indicates additionality was confirmed by the VVB using an investment test, which supports additionality robustness. The monitoring report states no material findings and no corrective actions, which is a positive integrity signal. However, leakage is stated as not addressed in the monitoring report (2023-02-24), and the baseline is project-specific with no stated baseline reassessment date, both of which weaken confidence in conservative crediting.

Transparency

The monitoring report clearly states the monitoring period (2012-03-28 to 2016-03-27) and shows claimed and verified ERs as equal at 71,419, which supports transparency for that period. The VVB is identified as VKU Certification Pvt. Ltd., aiding traceability. Transparency is reduced by conflicting ER values across two validation reports and inconsistent leakage statements across sources, which makes it harder to reconcile the public record.

Claim Safety

The project applies AMS I.D (version 14) and reports a grid emission factor of 0.927, which is directionally consistent with grid-displacement accounting. Claim safety is weakened because CORSIA eligibility and CCP status are not stated in the extracted record, leaving buyers uncertain about eligibility-based claims. The contradiction in verified ER totals (71,419 vs 149,672) materially increases the risk of overstated climate claims unless reconciled.

Documentation

The extracted record includes multiple key document types (PDD, validation report, monitoring report, issuance) and uses 11 documents with high extraction confidence, supporting a solid documentation base. Nevertheless, there are notable inconsistencies between the 2009 validation report and 2023 monitoring report on safeguards, grievance mechanism, FPIC, and benefit sharing, suggesting either later improvements or inconsistent reporting. The presence of two 2023 validation reports with conflicting verified ER totals is a significant documentation reliability concern.

Overall

I privilege the monitoring report (2023-02-24) for operational-period facts like the 2012–2016 monitoring window and the 71,419 verified ER figure because it is directly tied to monitored performance and aligns claimed and verified totals in that record. For safeguards/FPIC/grievance, I treat the newer monitoring report statements as more reflective of current practice, but the contradiction with the 2009 validation report still reduces confidence because it is unclear whether these were absent initially or merely undocumented. For leakage, I privilege the monitoring report’s statement that leakage was not addressed over an unspecified/unknown source claiming it was quantified, because the latter lacks a clear document reference and date. The unresolved ER discrepancy between two 2023 validation reports (71,419 vs 149,672) is the largest reliability issue and drives a downward adjustment to transparency, claim safety, and overall.

Audit Analysis

This is a grid-connected wind project under AMS I.D with additionality confirmed by the VVB and no reported material findings or corrective actions. However, key elements affecting credit quality—especially leakage treatment and baseline reassessment—are unclear or inconsistent across documents, and there is a major discrepancy in verified ER figures between two validation reports.

Project Description

Proponent: Multiple Proponents Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 25305 tCO2e Region: Asia Registration date: 2010-02-10

Red Flags

  • Large contradiction in verified emission reductions: 71,419 vs 149,672 across two 2023 validation reports
  • Leakage treatment is inconsistent: the monitoring report says leakage was not addressed, while another source indicates leakage was quantified
  • Baseline is project-specific and the timing of any baseline reassessment is not stated

Credit Vintages

Nessuna emissione registrata sul registro.

Cosa migliorerebbe questo punteggio

  • Publish a clear reconciliation note (or updated verification/issuance statement) explaining why two 2023 validation reports show different verified ER totals and which figure is authoritative for issuance.
  • Provide explicit leakage assessment (even if zero) with justification consistent across PDD/monitoring/verification, and state when the baseline/grid emission factor was last reassessed (including the grid EF vintage year).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal risk for wind generation

Leakage

Leakage not addressed / inconsistent

Baseline

Project-specific baseline; reassessment unclear

Safeguards

Safeguards/FPIC/grievance inconsistently documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-07 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti