15 MW Nam Hinboun Downstream Hydropower Project

VCS-3662 ↗

#407of 1935 in Renewable energy#2of 10 in Lao#206of 1339 in Verra (VCS)#144of 806 in AMS-I.D

5.9/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A 15 MW downstream hydropower project in Laos under VCS AMS I.D. with a VVB-confirmed investment additionality test and a standard grid-emission-factor baseline. The project is fundamentally sound for its type, but a contradiction in baseline methodology between the verification and monitoring reports, a discrepancy in the crediting-period start date, and low extraction confidence in the source documents introduce meaningful uncertainty into the credit claims.

Red Flags

  • Baseline method is recorded as 'project' in the verification report (2023-03-28) but 'jurisdictional' in the monitoring report (2023-11-06) — a methodological inconsistency that affects how the counterfactual is defined.
  • Crediting-period start date differs between documents: 2021-02-01 in the verification report versus 2022-02-01 in the monitoring report, shifting the pro-rata expectation by roughly 14%.
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, which undermines confidence in the extracted figures.

Credit Vintages

IssuedRetiredAvailable
2021
34,14334,1430
2022
32,65921,64711,012
Total66,80255,79011,012

Risk Indicators

Additionality

Investment test VVB-confirmed

Permanence

low inherent risk

Leakage

0% deduction, justified as negligible

Baseline

Method contradicted across documents

Safeguards

FPIC, grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents