Vai al contenuto principale
CDM Wind India Documentazione completa General Methodology v2.0

15 MW Wind Energy Project in Maharashtra

CDM-1778 ↗

4.9 / 10
Integrity
5.1
Transparency
4.8
Claim Safety
4.6
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project used a combined additionality test under CDM.

missing Leakage justification is not addressed in the monitoring record, and no buffer pool or reversal handling is stated.

Transparency

verified The project has multiple source documents available, including validation, PDD, and monitoring records, with a named VVB.

missing Verified versus claimed emission reductions are not stated, and key monitoring details such as usage monitoring are missing.

Claim Safety

verified The project is a wind energy CDM activity with a project-specific baseline and a grid emission factor stated in the documents.

missing Leakage treatment is weak and contradictory, which raises over-crediting risk despite the later note that it was deemed negligible.

Documentation

verified Nineteen documents were used, and the extraction confidence is medium rather than low.

missing The validation report lists multiple corrective action requests and clarification requests, showing that the documentation was not clean or fully straightforward.

Detailed Analysis

Integrity

The validation report confirms additionality through a combined test and states that TÜV NORD CERT GmbH verified it, which supports the project’s core integrity. However, the monitoring record does not address leakage, and no buffer pool, reversal event handling, or reassessment of the baseline is stated in the extracted record. The validation also reported 8 corrective action requests and 7 clarification requests, which weakens confidence in the robustness of the underlying project documentation.

Transparency

The record includes a named VVB, a monitoring period, a crediting period, and multiple document types, which helps transparency. At the same time, verified and claimed emission reduction totals are not stated, and usage monitoring details are missing. The extraction confidence is medium, so the documentation is usable but not especially strong.

Claim Safety

Claim safety is constrained by the weak leakage treatment and the absence of verified emission reduction figures in the extracted record. The project uses AMS I.D with a project baseline and a grid emission factor from 2006–2007, but the later contradiction says leakage was deemed negligible while the monitoring record says it was not addressed. I privileged the monitoring report’s explicit statement because it is the more direct source for leakage treatment, while noting the contradiction lowers confidence.

Documentation

The evidence base is reasonably broad, with validation, PDD, monitoring, and other documents listed, and 19 documents were used in extraction. The extraction confidence is medium, not low, so there is no severe readability penalty. Still, the presence of many corrective actions and the lack of several key quantified fields mean the documentation is only moderately complete.

Overall

Overall, this is a mid-quality carbon credit record: additionality is supported, but leakage and monitoring transparency are weak. The contradiction on leakage was handled by privileging the monitoring report’s explicit statement that leakage was not addressed over a later document’s weaker claim that it was negligible, because the former is more specific to the monitoring treatment. The many corrective actions from validation and the missing verified emissions figures reduce confidence in the claim even though the project is a standard CDM wind installation.

Audit Analysis

This is a CDM wind project with VVB-confirmed additionality and a standard project baseline, but the record shows weak treatment of leakage and a validation process with multiple corrective and clarification requests. The documentation is moderately complete, yet key items such as verified emission reductions, leakage rationale, and some monitoring details are missing or inconsistent, which limits confidence in the claim quality.

Project Description

Status: Registered Type: PA Methodology: AMS-I.D. Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 25.848 ktCO2e/yr

Red Flags

  • Leakage is not addressed in the monitoring record, and the only contradiction suggests a later document treated it as negligible without clear supporting detail.
  • The validation report recorded 8 corrective action requests and 7 clarification requests, indicating material documentation and implementation issues during validation.

Credit Vintages

Issued Retired Available
2011
34,732 0 34,732
2012
24,836 0 24,836
2013
13,890 0 13,890
2022
59,206 0 59,206
Total 132,664 0 132,664

Cosa migliorerebbe questo punteggio

  • Provide a clear, quantified leakage assessment and reconcile the contradiction between the monitoring report and the later document.
  • Publish verified emission reduction totals and the full monitoring methodology, including how usage and grid factors were applied.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No reversal treatment stated

Leakage

Leakage not addressed

Baseline

Project baseline, reassessment not stated

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti