16.45 MW bundled grid connected renewable energy project in Tamil Nadu, India
#992of 1935 in Renewable energy#502of 975 in India#715of 1459 in CDM (UNFCCC)#782of 1287 in ACM0002
Audit Analysis
A standard CDM wind project (16.45 MW, Tamil Nadu) with a VVB-confirmed investment additionality test and a jurisdictional grid baseline, but the record is undermined by a ten-fold discrepancy in the claimed emission reductions between the PDD and the validation report, the absence of any monitoring-period data, and low extraction confidence across the document set. The project is past its 2020 crediting-period end, so no verified performance data is available to confirm actual delivery.
Red Flags
- Ten-fold discrepancy in total emission reductions: the validation report states 35,257 tCO₂e while the PDD states 352,570 tCO₂e for the same 10-year crediting period; arithmetic on the 16.45 MW capacity suggests the PDD figure is more plausible, but the VVB document is the higher-priority source, leaving the true figure uncertain.
- No monitoring-period data or verified emission reductions are present in the extracted record, so actual performance against the claimed figure cannot be assessed.
- Low extraction confidence across the document set means at least one key document was poorly readable, reducing reliability of all extracted values.
- Safeguards are mentioned but no FPIC process, grievance mechanism, or detailed stakeholder engagement record is documented.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% with negligible justification
Jurisdictional grid EF (2007 CEA)
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →