16.875 MW Large Scale Grid Connected Wind Electricity Generation Project by Indian Renewable Energy Foundation
#736of 1935 in Renewable energy#362of 975 in India#504of 1459 in CDM (UNFCCC)#575of 1287 in ACM0002
Audit Analysis
A 16.875 MW grid-connected wind project in India validated under CDM with a well-structured investment additionality test confirmed by Bureau Veritas and a jurisdictional grid-emission-factor baseline. However, a ten-fold discrepancy in the claimed emission reductions between the PDD and the validation report, combined with low extraction confidence and the absence of any verified monitoring-period data, significantly undermines confidence in the project's quantitative claims.
Red Flags
- Ten-fold discrepancy in total emission reductions: the PDD states 337,306 tCO2e while the validation report states 33,731 tCO2e — a factor-of-ten gap that is not explained in the extracted record and raises serious data-reliability concerns.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing trust in the completeness of the evidence base.
- No verified monitoring-period emission reductions, no monitoring period dates, and no issuance data were found in the extracted record, leaving the project's actual delivery unconfirmed.
- Thirteen material findings were logged during validation (including corrected baseline emission-factor calculation errors and a change in the number of wind turbines from 80 to 75), indicating the initial PDD contained multiple substantive errors.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Negligible, appropriate for wind
Jurisdictional but 2007 grid EF, no reassessment data
FPIC conducted, safeguards and benefit-sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →