17.6 MW captive grid connected electricity generation from wind energy project by Chennai Petroleum Corporation Limited.
#468of 1935 in Renewable energy#239of 975 in India#303of 1459 in CDM (UNFCCC)#352of 1287 in ACM0002
Audit Analysis
A 17.6 MW CDM wind project in India with a jurisdictional grid baseline and VVB-confirmed additionality, but the verification report flagged ten corrective action requests covering gaps in CDM consideration evidence, investment analysis, boundary definition, and environmental impact assessment. Verified emissions reductions for the first monitoring period (~2.2 years) reached roughly 90% of the pro-rata lifetime expectation, indicating reasonable but not exceptional delivery. The project is an avoidance type with low permanence risk, though several transparency and safeguards fields remain unaddressed in the available record.
Red Flags
- Ten corrective action requests in the verification report, including missing CDM consideration evidence, insufficient investment analysis, and absent environmental/transboundary impact analysis
- Two contradictions between documents: the PDD reports a lifetime ERR of 341,860 tCO₂e while the monitoring report cites 75,115 tCO₂e, and the crediting period start date differs by four months between the validation report and the monitoring report
- Safeguards are mentioned but FPIC, grievance mechanism, and benefit-sharing details are not quantified or documented in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 67,464 | 0 | 67,464 | |
| Total | 67,464 | 0 | 67,464 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional grid EF (0.9293, 2007)
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →