18 MW Kemphole Mini Hydel Scheme (KMHS), by International Power Corporation Limited, India
Score Breakdown
Integrity
verified The verification report confirms additionality through an investment test, and the VVB is named as 4K EARTH SCIENCE PRIVATE LIMITED.
missing Leakage justification is recorded as not addressed in the monitoring report, and the project file includes numerous corrective actions on methodology, boundary, and monitoring controls.
Transparency
verified The monitoring period and crediting period are stated, and claimed and verified emission reductions are identical at 112,482 tCO2e.
missing The monitoring report requests resubmission of revised documents, clearer period boundaries, invoices, calibration certificates, and a current monitoring report, indicating incomplete public documentation.
Claim Safety
verified The project is not CORSIA-eligible, which reduces dual-market claim risk.
missing The baseline is project-specific rather than a more conservative standardized baseline, and leakage treatment is weakly supported in the available record.
Documentation
verified Multiple official documents were available, including the PDD, validation report, monitoring report, and issuance-related material.
missing The monitoring report contains many corrective actions and the extraction record notes a contradiction on the crediting period between monitoring documents.
Detailed Analysis
Integrity
The project has a positive integrity signal because the verification report confirms additionality through an investment test, and the monitoring record shows no reversal events. At the same time, the baseline is project-specific and the monitoring report says leakage is not addressed, which weakens robustness for a hydropower project. The many corrective actions, including methodology, boundary, and calibration issues, further reduce confidence in the underlying MRV quality.
Transparency
Transparency is only moderate because the monitoring period, crediting period, and exact claimed versus verified issuance are available, with both totals reported as 112,482. However, the monitoring report asks for resubmission of revised documents, a clearer monitoring-period definition, invoices, calibration certificates, and a current monitoring report, all of which point to incomplete disclosure. The extraction record also shows a contradiction on the crediting period across monitoring documents, which lowers reliability.
Claim Safety
Claim safety is middling: the project is not CORSIA-eligible, which reduces the risk of overlapping international claims, but the CCP status is not stated. The baseline remains project-specific, and the leakage treatment is weak because one document says leakage was quantified while the monitoring report says it was not addressed. Because the claimed and verified issuance match exactly, over-crediting is not obvious from the extracted figures, but the documentation issues keep the risk above average.
Documentation
Documentation quality is fair but not strong. There are several official documents in the record and extraction confidence is high, yet the monitoring report lists many corrective actions and requests for missing supporting evidence. The contradiction on the crediting period between monitoring documents also suggests that the file set is not fully clean or internally consistent.
Overall
Overall, this is a moderately credible VCS renewable-energy project, but not a high-confidence one. I privileged the more recent monitoring report for leakage and safeguard-related statements because it is later than the validation report, while noting that the validation report and PDD conflict on FPIC, benefit sharing, and leakage treatment. Those contradictions, plus the unresolved corrective actions and project-specific baseline, justify a cautious mid-range score rather than a strong one.
Audit Analysis
This is a registered VCS hydropower project with VVB-verified additionality and no reported reversal events, which supports moderate integrity. However, the file set shows several documentation and methodology issues, including unresolved leakage treatment, multiple corrective actions, and contradictions across documents that reduce confidence in the claims.
Project Description
Proponent: International Power Corporation Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 44548 tCO2e Region: Asia Registration date: 2019-07-29
Red Flags
- Leakage is marked as not addressed in the monitoring report, despite an earlier document indicating it was quantified.
- The monitoring report lists many corrective actions, including unclear monitoring periods, missing calibration evidence, and methodology/boundary issues.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 1,496 | 1,412 | 84 | |
| 2015 | 36,869 | 36,869 | 0 | |
| 2016 | 37,305 | 37,305 | 0 | |
| 2017 | 37,601 | 33,990 | 3,611 | |
| 2018 | 44,240 | 0 | 44,240 | |
| 2019 | 9,856 | 0 | 9,856 | |
| 2020 | 22,554 | 0 | 22,554 | |
| 2021 | 30,731 | 0 | 30,731 | |
| Total | 220,652 | 109,576 | 111,076 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled document set that resolves the contradictions on FPIC, benefit sharing, leakage treatment, and the crediting period.
- Submit complete monitoring evidence, including calibrated meter records, invoices, a clear monitoring report, and a documented leakage assessment aligned with the methodology.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project with no reversals reported
Leakage not addressed in latest monitoring record
Project-specific baseline
Grievance mechanism noted, but FPIC disputed
Not CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →