180 MW Renewable Energy Project by Greenko Group
GS-2569 ↗ · current registry ID: GS7724
#1064of 1935 in Renewable energy#545of 975 in India#763of 1801 in Gold Standard (GS)#837of 1287 in ACM0002
Audit Analysis
A 180 MW solar thermal electricity project in India with VVB-confirmed additionality and a recent baseline reassessment, but undermined by seven inter-document contradictions, missing generation data for several months, inconsistent ER values flagged in corrective actions, and a 0% leakage deduction whose justification is contradictory across documents. The project type carries inherently low permanence risk, yet the data-quality issues and CORSIA eligibility create moderate over-crediting and dual-channel concerns.
Red Flags
- Seven contradictions between documents, including a 3.5× discrepancy in claimed ER (1,658,745 in the appendix vs 465,575 in the monitoring report) and conflicting baseline method descriptions (project-specific vs jurisdictional)
- Six corrective actions remain, including missing generation data for seven months (Apr–May 2020, Sep–Nov 2021, Jan–Mar 2021) and inconsistent ER values between the monitoring report and the ER sheet
- Leakage deduction of 0% with justification described as 'not addressed' in the verification report while the monitoring report calls it 'deemed negligible' — no quantified assessment found
- CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel use risk
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 12,110 | 3,750 | 8,360 | |
| 2020 | 175,205 | 130,365 | 44,840 | |
| 2021 | 285,532 | 48,419 | 237,113 | |
| 2022 | 292,142 | 0 | 292,142 | |
| Total | 764,989 | 182,534 | 582,455 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, justification contradictory
Project-specific, reassessed 2025
FPIC, grievance mechanism present
CORSIA-eligible, CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →