19.5 MW Wind project by GMDC
#1287of 1935 in Renewable energy#682of 975 in India#1006of 1459 in CDM (UNFCCC)#1002of 1287 in ACM0002
Audit Analysis
A 19.5 MW wind project in India validated under CDM with a jurisdictional grid baseline and VVB-confirmed combined additionality test. However, four material findings (including an unaddressed baseline justification gap and PLF inconsistency) and a six-fold discrepancy between the PDD's claimed emissions reductions and the validated figure raise significant concerns about the robustness of the credit claim. Monitoring data, FNRB details, and buffer pool information are absent from the available record.
Red Flags
- PDD claims 238,318 tCO2e in emissions reductions while the validation report validates only 40,474 tCO2e — a six-fold gap that suggests the initial claim was not well-supported by the project's actual parameters
- CAR 02 in the validation report states the project proponent failed to provide proper justification for why the baseline scenario remains unchanged with reference to national policies, directly undermining baseline validity
- CAR 04 flags that net electricity values and PLF values are inconsistent with the first registered PDD, indicating data reliability issues in the monitoring framework
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
avoidance-type project
Deemed negligible, reasonable for wind
Jurisdictional but CAR 02 flags justification gap
Mentioned but FPIC and grievance details absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →