2.10 MW Wind Power Project activity by Knack Packaging Private Limited
#726of 770 in Renewable energy#8of 9 in Gujarat#403of 421 in Universal Carbon Registry (UCR)#408of 417 in AMS-I.D
Audit Analysis
A 2.10 MW wind power project in Gujarat registered under the UCR standard, but the available record consists solely of a PDD dated after the crediting period ended, with no verification report, monitoring report, or VVB assessment. Additionality is entirely undocumented, the grid emission factor is drawn from 2014, and the 5,528 claimed ERR figures have not been independently verified. The project type (wind) carries inherently low reversal and leakage risk, but the absence of any third-party verification or monitoring data leaves the core claims unvalidated.
Red Flags
- No additionality test type or VVB verification is documented in the available record; the PDD does not specify which additionality criterion was applied or by whom it was confirmed.
- The PDD is dated 30 August 2025, approximately eight months after the crediting period (1 Jan – 31 Dec 2024) ended, raising questions about whether the project was retroactively documented or the dates are inconsistent.
- The grid emission factor of 0.9 tCO₂/MWh is sourced from 2014 data, a ten-year gap relative to the 2024 crediting period, with no reassessment or updated value provided.
- No verification body is named and no monitoring report exists; the 5,528 ERR figure is unverified and cannot be cross-checked against measured generation data.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation documented
No buffer pool; low inherent risk for wind asset
0% deemed negligible, consistent with wind sector
Jurisdictional baseline; grid EF from 2014, no reassessment
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →