2.4 MW Wind Power Project in Rajasthan State
#285of 1935 in Renewable energy#137of 975 in India#172of 1459 in CDM (UNFCCC)#105of 806 in AMS-I.D
Audit Analysis
A 2.4 MW CDM wind project in Rajasthan with a confirmed investment-test additionality and a jurisdictional grid baseline, but the record is weakened by a large discrepancy between the ex-ante estimate (3,684 tCO₂) and the cumulative verified figure (21,002 tCO₂), a power-loss-factor inconsistency flagged in the validation report, and several key MRV parameters that are absent from the extracted record. The project type (wind, displacing grid electricity) inherently limits permanence and leakage risk, but the data gaps and contradictions prevent a higher confidence rating.
Red Flags
- The validation report (2012) lists an ex-ante estimate of 3,684 tCO₂ for the full crediting period, while the monitoring report (2022) reports 21,002 tCO₂ verified over 8 years — a 5.7× divergence that is not explained in the available documents and raises questions about the accuracy of either figure.
- The validation report flagged a power-loss-factor discrepancy: supplier data indicated 22.1% but the PDD used 19%, requiring justification that was listed as a material finding.
- The grid emission factor of 0.9225 tCO₂/MWh is anchored to 2008 data; no updated or reassessed baseline value is found in the extracted record.
- Four corrective actions were required at validation (PDD revision for sustainable-development contribution, coordinate documentation, board-approved financials, metering accuracy class), indicating the initial submission had material gaps.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Wind avoidance – no reversal risk
0% – negligible for grid displacement
Jurisdictional grid EF (2008)
Mentioned; FPIC & grievance not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →