Skip to main content
UCRKullu Himachal Pradesh IndiaAMS-I.D

2.40 MW Small Scale Hydro Power Project in Himachal Pradesh by Raghupreet Hydro Projects Pvt. Ltd.

UCR-68 ↗

#488of 770 in Renewable energy#3of 7 in Kullu Himachal Pradesh India#45of 421 in Universal Carbon Registry (UCR)#189of 417 in AMS-I.D

4.0/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 2.40 MW small hydro project under the UCR registry with a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists solely of the PDD with no verification report, monitoring report, or identified VVB. The absence of additionality confirmation, ERR figures, and any post-issuance monitoring data creates significant evidence gaps that limit confidence in the project's integrity and transparency.

Red Flags

  • No verification report or monitoring report is present in the extracted record; only the PDD (dated 2022-01-03) is available, leaving additionality, ERR verification, and MRV performance unconfirmed
  • No VVB is identified in the available documents, making it impossible to confirm independent third-party verification of additionality or baseline assumptions
  • Total ERR claimed and verified figures are both absent, preventing any assessment of over- or under-crediting

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available recor

Permanence

Hydro generation project; no inherent reversal risk

Leakage

0% deduction, deemed negligible — appropriate for hydro

Baseline

Jurisdictional baseline; reassessment timing not stated

Safeguards

FPIC conducted and safeguards mentioned; grievance mechanism

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents