2.85 MW Bundled Wind Power Project by Manjeet Cotton, India
#737of 1935 in Renewable energy#363of 975 in India#505of 1459 in CDM (UNFCCC)#254of 806 in AMS-I.D
Audit Analysis
A 2.85 MW grid-connected wind project in India validated under CDM AMS-I.D with a jurisdictional baseline and VVB-confirmed investment additionality. The project is inherently low-risk on permanence (avoidance type) and leakage, but the validation report recorded ten material findings (all subsequently resolved) and the available record lacks any monitoring-period data. A ten-fold discrepancy in the claimed emission reduction between the PDD and the validation report was resolved in favour of the later, authoritative validation figure.
Red Flags
- Ten material findings (CAR01–CAR10) in the validation report, including an incorrect operating-margin calculation method, a missing emission-reduction spreadsheet, and an unrealistic crediting-period start date — all resolved before approval but indicative of a weak initial submission
- No monitoring-period data, usage-monitoring method, or FNRB value found in the extracted record, leaving post-validation performance unverified
- Minimum extraction confidence rated low, meaning at least one key document was poorly readable and the completeness of the evidence base is uncertain
- PDD (June 2012) states a total emission reduction of 46,520 tCO₂e while the validation report (September 2012) states 4,652 tCO₂e — a ten-fold discrepancy resolved in favour of the validation report
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project – no reversal risk
0 % – deemed negligible, reasonable for grid wind
Jurisdictional grid EF (0.9224, 2009)
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →