2 MW Gogripur Hydro Power Project at Village Gogripur, District Karnal of State Haryana (India)

CDM-7052 ↗

#810of 1935 in Renewable energy#407of 975 in India#569of 1459 in CDM (UNFCCC)#275of 806 in AMS-I.D

5.3/ 10
Integrity
6.8
Transparency
3.2
Claim Safety
6.2
Documentation
3.5

Audit Analysis

A small 2 MW run-of-river hydro project in Haryana, India, validated by SGS UK under CDM methodology AMS-I.D v17, with a jurisdictional baseline and VVB-confirmed investment additionality. The project is fundamentally sound in design, but the available record is limited to the PDD and validation report, with no monitoring or verification data extracted and low extraction confidence, making it difficult to confirm actual delivery against the 93,570 tCO2e lifetime claim.

Red Flags

  • No monitoring or verification reports found in the extracted record; actual emissions reductions for any period are unconfirmed
  • Low extraction confidence across the document set, meaning key data may have been missed or misread
  • Five material findings (CARs) raised during validation, including gaps in stakeholder consultation timing and justification of plant load factor, though all were resolved
  • Crediting period dates differ between the PDD (Feb 2012–Feb 2022) and the validation report (Jul 2012–Jul 2022)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Hydro infrastructure; no reversal risk

Leakage

Deemed negligible; reasonable for 2 MW hydro

Baseline

Jurisdictional grid EF (0.9, 2011)

Safeguards

Mentioned; no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents