5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A 10 MW small hydro project in Himachal Pradesh with a VVB-verified combined additionality test and a jurisdictional grid baseline, but undermined by four material contradictions between the PDD/validation report and the monitoring report, a ~40% under-delivery against the pro-rata ex-ante expectation, and a long list of initial documentation deficiencies (12 material findings) that were subsequently resolved. The project is structurally sound for a grid-connected hydro scheme, but the data inconsistencies and missing verified figures limit confidence in the claimed reductions.

Red Flags

  • Four contradictions between the 2007 PDD/validation report and the 2012 monitoring report affect the lifetime ERR, baseline method, grid emission factor, and crediting period — the two document sets describe materially different project parameters
  • The monitoring report claims 43,749 tCO₂e over a 2-year period, which is only ~60% of the pro-rata expectation derived from the PDD's 367,230 tCO₂e lifetime estimate, suggesting the ex-ante estimate was optimistic or the project under-performed
  • Twelve material findings were raised during validation (missing host-country approval, unclear baseline formula, missing IRR details, unclear project boundary, etc.), indicating a weak initial documentation package
  • No verified ERR figure is available in the extracted record; only the claimed figure from the monitoring report is present

Credit Vintages

IssuedRetiredAvailable
2013
31,643031,643
Total31,643031,643

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low reversal risk for hydro

Leakage

0% with negligible justification

Baseline

Jurisdictional but contradicted by appendix

Safeguards

Grievance & benefits sharing; FPIC not stated

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS I.D. “Grid connected renewable electricity generation”

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents