Skip to main content
UCRRajasthan IndiaACM0002

20 MW wind project by Champak Pragathi Foundations

UCR-520 ↗

#669of 770 in Renewable energy#7of 8 in Rajasthan India#307of 421 in Universal Carbon Registry (UCR)#363of 383 in ACM0002

3.0/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

A 20 MW wind project in Rajasthan registered under the UCR standard with a jurisdictional baseline and ACM0002 methodology, but the available evidence is limited to a single PDD document. No verification report, monitoring report, or VVB assessment was found, leaving additionality, permanence safeguards, and actual performance unverified. The project type carries inherently low permanence risk, but the documentation gap prevents a confident quality assessment.

Red Flags

  • No verification report or VVB assessment found in the extracted record; additionality test type and VVB confirmation are not stated
  • No monitoring report available; total ERR verified is not stated, so actual performance against the 425,643 claimed ERR cannot be assessed
  • Buffer pool percentage not stated; permanence risk mitigation is unconfirmed despite the project type
  • Only one document (PDD) was used for extraction, with medium confidence; the evidentiary base is very thin for a 12-year crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated

Permanence

Wind project; no carbon stock reversal risk

Leakage

0% deemed negligible; consistent with wind

Baseline

Jurisdictional method; reassessment date not stated

Safeguards

Mentioned in PDD; FPIC and grievance mechanism not confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents