20MW Bagasse based Cogeneration power project at Bannari Amman Sugars Limited, Sathyamangalam, Tamil Nadu by Bannari Amman Sugars Limited
#150of 352 in Biomass#715of 975 in India#1061of 1459 in CDM (UNFCCC)#24of 81 in ACM0006
Audit Analysis
A 20 MW bagasse cogeneration project under CDM with VVB-confirmed additionality (barrier test by SGS UK), but significant data gaps in monitoring, MRV parameters, and permanence. Four contradictions between the validation report and earlier appendices create uncertainty around baseline method, leakage treatment, and crediting period. The project is past its crediting period (ended December 2021) with no verified emissions reductions available for comparison.
Red Flags
- Four contradictions between the validation report (2010) and an earlier appendix (2008) on leakage treatment, additionality test type, baseline method, and crediting period dates
- No monitoring reports or verified ERR figures found in the extracted record; total ERR claimed (803,850 tCO2e) cannot be cross-checked against actual performance
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, undermining reliability of all extracted facts
- Grid emission factor of 0.85 tCO2/MWh is from 2008 and no updated value or reassessment is documented
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
No reversal data; energy-substitution project
0% deduction, contradictory appendix reference
Project-specific, 2008 grid EF, no reassessment
Safeguards mentioned, benefit-sharing described, no FPIC or
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →