21.8 MW Wind Power Project at Jangi Vandhiya, Gujarat by Powerica Limited

VCS-1823 ↗

4.3 / 10
Integrity
4.6
Transparency
4.1
Claim Safety
3.8
Documentation
5.0

Score Breakdown

Integrity

verified Additionality was tested using an investment test and confirmed by the VVB in the monitoring record.

missing Leakage is not addressed in the 2023 monitoring report, and the report also notes inconsistencies with the registered monitoring plan.

Transparency

verified The project has a named VVB and a defined 2022 monitoring period in the monitoring report.

missing The monitoring report required corrective actions for incomplete sections, outdated template use, and inconsistent parameters, which weakens reporting clarity.

Claim Safety

verified The project is a renewable wind installation under VCS with a project baseline, which is generally lower risk than many crediting categories.

missing The verified 2022 issuance figure is much lower than the earlier claimed amount, and the report raises a double-counting concern with other programmes and REC mechanisms.

Documentation

verified Multiple official documents were available, including validation, monitoring, PDD, and issuance records, with high extraction confidence.

missing The monitoring report contains several corrective actions and some key items, such as buffer pool treatment and leakage deduction, are not stated in the extracted record.

Detailed Analysis

Integrity

The project has a reasonably solid additionality basis because the monitoring record says an investment test was used and the VVB confirmed it. However, integrity is weakened by the 2023 monitoring report stating leakage is not addressed, by the absence of any buffer pool or reversal information, and by corrective actions noting inconsistencies with the registered monitoring plan. The project is an avoidance-style wind project, so permanence risk is inherently low, but the documentation does not fully close out all integrity questions.

Transparency

Transparency is mixed. The monitoring report identifies the VVB, the 2022 monitoring period, and the project’s reporting context, but it also lists several corrective actions for incomplete template sections, missing stakeholder communication detail, and inconsistent parameters. That combination suggests the reporting trail exists but is not fully clean or fully complete.

Claim Safety

Claim safety is below average because the monitoring report flags a need for a declaration to avoid double counting with another GHG reductions programme and India’s REC mechanism. The verified 2022 emission reductions of 38,520 are far below the earlier claimed 203,799, which raises over-crediting or at least claim-consistency concerns. The project type is a wind project under VCS, which is generally safer than many categories, but the specific evidence here is not strong enough for a high score.

Documentation

Documentation breadth is decent because the extracted record draws on multiple official documents, including validation, monitoring, PDD, and issuance materials, and extraction confidence is high. Still, the monitoring report includes several corrective actions, and some important items such as buffer pool treatment, leakage deduction, and usage monitoring details are not stated in available documents. The crediting period is also not perfectly aligned across documents, which reduces documentation quality somewhat.

Overall

I privileged the 2023 monitoring report over the older validation record where the two conflict, because it is more recent and directly tied to the monitored issuance period. That means I treated leakage as not addressed rather than negligible, and I used the 38,520 verified figure rather than the earlier 203,799 claimed amount. The contradictions materially reduce confidence: the emission reduction discrepancy, the crediting-period mismatch, and the double-counting warning all point to weaker claim reliability even though the project has a valid registration and some positive safeguards.

Audit Analysis

This is a registered wind project with VVB-verified additionality and a clear project baseline, but the evidence set shows material reliability and claim-quality concerns. The biggest issues are the large discrepancy between claimed and verified emission reductions, leakage not being addressed in the newer monitoring report, and a double-counting warning tied to other GHG programmes and India’s REC mechanism.

Project Description

Proponent: POWERICA LIMITED Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 50207 tCO2e Region: Asia Registration date: 2018-11-21

Red Flags

  • The monitoring report flags a need for a declaration to avoid double counting because the project was registered in another GHG reductions programme and with India’s REC mechanism.
  • Verified emission reductions for 2022 were 38,520, far below the 203,799 claimed in the earlier validation record, indicating a major claim discrepancy.
  • Leakage is marked as not addressed in the 2023 monitoring report, while an older report had treated it as negligible.
  • The monitoring report lists several corrective actions, including template non-compliance and inconsistencies with the registered monitoring plan.

Credit Vintages

Issued Retired Available
2014
20,949 20,949 0
2015
48,222 48,222 0
2016
45,338 45,338 0
2017
48,341 48,341 0
2018
46,752 46,752 0
2019
48,616 48,616 0
2020
38,094 0 38,094
2021
41,555 0 41,555
2022
38,520 0 38,520
Total 376,387 258,218 118,169

Cosa migliorerebbe questo punteggio

  • Provide a clear, current declaration and registry evidence showing no double counting across VCS, other GHG programmes, and India’s REC mechanism.
  • Publish a fully reconciled monitoring package that explains the gap between claimed and verified reductions, addresses leakage explicitly, and resolves all corrective actions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance project

Leakage

Leakage not addressed

Baseline

Project baseline, reassessment missing

Safeguards

FPIC and grievance present

Double-claim

Dual-claim risk not resolved

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti