21 MW Wind Energy Project by Shree Cement Limited

GS-1454 ↗ · current registry ID: GS6999

#1205of 1935 in Renewable energy#631of 975 in India#997of 1801 in Gold Standard (GS)#939of 1287 in ACM0002

4.8/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A 21 MW onshore wind project in India with VVB-confirmed additionality and a standardised grid-emission-factor baseline, but undermined by nine cross-document contradictions, eight material findings, and a corrective action questioning the validity of the baseline for the second crediting period. The verified ERR (45,880 tCO₂) is roughly half of what the monitoring report claimed (100,767 tCO₂) for the 2.25-year monitoring window, raising over-claiming concerns. FPIC was not conducted per the most recent verification report, and leakage treatment is inconsistent across documents.

Red Flags

  • Corrective action raised by the VVB: the validity of the baseline and its data/parameters is not demonstrated in the PDD for the second crediting period (verification report, 2024-03-12).
  • The monitoring report claims 100,767 tCO₂ for the 2023-03-28 to 2025-06-30 period, but the VVB verified only 45,880 tCO₂ — a 54% gap that suggests the project delivered far less than claimed.
  • Nine contradictions across documents, including conflicting baseline methods (project-specific vs jurisdictional), conflicting additionality tests (investment vs combined), and conflicting FPIC status (conducted in 2020 VR vs not conducted in 2024 VR).
  • FPIC was not conducted per the 2024 verification report, and benefit-sharing is not described in the same document, despite a grievance mechanism being in place.
  • Leakage justification is inconsistent: the verification report states it was not addressed, while the monitoring report deems it negligible, with a 0% deduction applied.

Credit Vintages

IssuedRetiredAvailable
2018
34,46134,4610
2019
47,65747,59760
2020
40,26540,2650
2021
41,855041,855
2022
38,174038,174
2023
7,6581757,483
Total210,070122,49887,572

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no inherent reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Grid-EF baseline, CAR on 2nd CP validity

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents