24.6 MW Wanger Homte Hydro Electric Project in Himachal Pradesh

UCR-134 ↗

#12of 433 in Universal Carbon Registry (UCR)#1152of 1287 in ACM0002

4.2/ 10
Integrity
5.5
Transparency
2.0
Claim Safety
5.5
Documentation
2.5

Audit Analysis

The Wanger Homte 24.6 MW hydro project uses a jurisdictional baseline and a reasonable grid emission factor, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB confirmation. Additionality is not explicitly documented, and the absence of any verified ERR figure or independent review significantly limits confidence in the claimed 112,856 tCO₂e.

Red Flags

  • No verification report or monitoring report found in the extracted record; the claimed ERR of 112,856 tCO₂e is unverified
  • Additionality test type and VVB confirmation are not stated in the PDD, leaving the additionality claim unsupported by the available documentation
  • Only a single document (PDD) is available; no independent third-party review evidence exists in the record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not explicitly documented in PDD

Permanence

Hydro project – inherently low reversal risk

Leakage

0% deemed negligible – reasonable for grid-connected hydro

Baseline

Jurisdictional baseline; reassessment timing not stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not confirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents