Audit Analysis
The Wanger Homte 24.6 MW hydro project uses a jurisdictional baseline and a reasonable grid emission factor, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB confirmation. Additionality is not explicitly documented, and the absence of any verified ERR figure or independent review significantly limits confidence in the claimed 112,856 tCO₂e.
Red Flags
- No verification report or monitoring report found in the extracted record; the claimed ERR of 112,856 tCO₂e is unverified
- Additionality test type and VVB confirmation are not stated in the PDD, leaving the additionality claim unsupported by the available documentation
- Only a single document (PDD) is available; no independent third-party review evidence exists in the record
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test not explicitly documented in PDD
Hydro project – inherently low reversal risk
0% deemed negligible – reasonable for grid-connected hydro
Jurisdictional baseline; reassessment timing not stated
Safeguards mentioned; FPIC and grievance mechanism not confirmed
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →