24.8 MW Wind power project by Belgaum Wind Farms Private Ltd. in Gadag, Karnataka

CDM-1687 ↗

4.2 / 10
Integrity
4.8
Transparency
3.9
Claim Safety
4.2
Documentation
3.4

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses the ACM0002 methodology with a project-based baseline.

missing Leakage is not addressed in the validation report, and the contradiction suggests inconsistent treatment across documents.

Transparency

verified The monitoring period is stated, and the project is tied to a named VVB, which helps traceability.

missing Total ER claims and verified issuance figures are not found in the extracted record, and the low extraction confidence limits document clarity.

Claim Safety

verified The project is a wind power CDM activity, which generally has lower permanence risk than removal projects.

missing The baseline is project-specific rather than a clearly reassessed standardized baseline, and leakage treatment is uncertain because of the document contradiction.

Documentation

verified Multiple evidence documents were used, including a validation report and PDD.

missing One key document was poorly readable, and a material finding was recorded with no corrective actions listed.

Detailed Analysis

Integrity

The validation report from PJRCES Inc. confirms additionality and identifies the ACM0002 methodology, which supports the project’s core integrity case. However, the baseline is project-based and the record does not show a reassessment date, while leakage is marked as not addressed in the validation report. The project is a wind avoidance activity, so permanence risk is inherently lower, but the absence of a buffer pool and the unresolved leakage treatment keep the score below strong levels.

Transparency

The monitoring period is stated as 2018-07-07 to 2020-12-31, and the VVB is named, which improves traceability. Still, the extracted record does not provide claimed or verified emission reduction totals, nor any usable monitoring details for usage or grid factors. Because the extraction confidence is low, the documentation trail appears incomplete and harder to audit.

Claim Safety

Claim safety is moderate because the project is a CDM wind project with VVB-confirmed additionality, which reduces the risk of a fundamentally weak crediting case. That said, the baseline remains project-specific, leakage is inconsistently treated, and there is no evidence in the extracted record for CORSIA or CCP status. The contradiction on leakage means the emissions claim should be treated cautiously.

Documentation

The record draws on seven documents, including a validation report and PDD, which is a positive sign for coverage. But one key document was poorly readable, the extraction confidence is low, and a material finding was recorded without any corrective actions listed. The crediting period is stated, but the available documentation still leaves important gaps around monitoring and issuance details.

Overall

Overall, this is a mid-quality CDM wind project with a credible additionality signal, but the evidence base is not strong enough for high confidence. I privileged the validation report over the later leakage note because it is the higher-priority project assurance document and the contradiction is not resolved by a clear, dated methodology update. The low extraction confidence and the unresolved leakage discrepancy justify a conservative score.

Audit Analysis

This is a CDM wind project with VVB-confirmed additionality and a project-based baseline, but the evidence set is thin and one key document was hard to read. Leakage treatment is weakly documented, and the record contains a contradiction on whether leakage was addressed, which reduces confidence in the claimed emissions reductions.

Project Description

Status: Registered Type: PA Methodology: ACM2 Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 51.985 ktCO2e/yr Reductions 2nd period: 54.653 ktCO2e/yr

Red Flags

  • Leakage justification is missing in the validation report, while a later document reportedly treats leakage as negligible; the record does not explain why the later view should override the earlier one.
  • A material finding was raised in validation, and the extraction confidence is low, which weakens confidence in the completeness of the documentation.

Credit Vintages

Issued Retired Available
2011
68,642 0 68,642
2012
54,750 0 54,750
2016
115,252 0 115,252
2022
93,661 0 93,661
Total 332,305 0 332,305

Cosa migliorerebbe questo punteggio

  • Provide a clear, dated leakage assessment or methodology update that reconciles the contradiction between documents.
  • Publish verified issuance totals, monitoring calculations, and a readable full document set with any corrective actions closed out.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Wind avoidance project

Leakage

Leakage treatment inconsistent

Baseline

Project baseline, reassessment missing

Safeguards

No safeguards evidence found

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti