Skip to main content
CDMHydroIndiaACM0002

24 MW Kut Hydro Power Project

CDM-3033 ↗

#200of 1935 in Renewable energy#102of 975 in India#119of 1459 in CDM (UNFCCC)#141of 1287 in ACM0002

6.3/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.5
Documentation
7.0

Audit Analysis

The 24 MW Kut Hydro Power Project is a CDM-registered avoidance project in India with a jurisdictional baseline (reassessed 2022) and VVB-confirmed additionality via a combined test. The project displaces grid electricity (0.8 tCO₂/MWh), making leakage and reversal risks inherently low, but the absence of a buffer pool, unperformed FPIC, and a contradiction in leakage treatment between the monitoring report and an appendix introduce moderate uncertainty. Verified emission reduction figures are not available in the extracted record, limiting the ability to confirm actual delivery against the pro-rata expectation.

Red Flags

  • Verified ERR figure is not stated in any available document, preventing confirmation of actual delivery against the pro-rata expectation for the 2019–2020 monitoring period
  • Leakage treatment is inconsistent: the monitoring report (2022) states leakage is deemed negligible with a 0% deduction, while an appendix describes it as 'quantified' — the basis for the 0% deduction is therefore unclear
  • Free, Prior and Informed Consent (FPIC) was not conducted, and no grievance mechanism is documented, despite safeguards being mentioned in the project documents

Credit Vintages

IssuedRetiredAvailable
2022
200,5650200,565
Total200,5650200,565

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, contradicted by appendix

Baseline

Jurisdictional, reassessed 2022

Safeguards

Safeguards mentioned, FPIC not conducted, no grievance mecha

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents