24 MW Perla Mini Hydel Project, Karnataka, India
#101of 1935 in Renewable energy#52of 975 in India#57of 1459 in CDM (UNFCCC)#69of 1287 in ACM0002
Audit Analysis
A straightforward CDM mini-hydro project in Karnataka with a well-documented additionality assessment (combined test, VVB-confirmed by DNV) and a reasonable grid-displacement baseline. The project shows no reversal risk, a justified zero-leakage claim, and all validation findings were resolved without outstanding corrective actions. Key gaps include the absence of a verified ERR figure, an unquantified FNRB, and a grid emission factor locked to 2006 data, which limits confidence in long-term baseline accuracy.
Red Flags
- Grid emission factor is based on 2006 data (854.7 gCO₂/kWh) and has not been updated; under CDM rules this is locked at registration, but it represents a 17+ year-old baseline reference for a project operating through 2019.
- Verified ERR figure is not stated in the extracted record; only the claimed figure (452,390 tCO₂e) from the monitoring report is available, making independent over-crediting assessment impossible.
- FPIC was not conducted and no grievance mechanism is documented, though these are less critical under CDM than under VCS.
- Baseline method is characterised as 'jurisdictional' in the 2024 monitoring report but 'project' in the 2009 validation report, creating ambiguity about the exact baseline construction.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 62,979 | 0 | 62,979 | |
| Total | 62,979 | 0 | 62,979 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% justified as negligible
Grid EF from 2006, method label inconsistent
Safeguards mentioned, no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →