Audit Analysis
The Shamburi Mini Hydel Project is a straightforward CDM hydro avoidance project with a VVB-confirmed combined additionality test and a jurisdictional baseline, but its integrity is undermined by a corrective action on missing DNA approval letters, seven conditions listed in the 2012 verification report, and a significant discrepancy between two monitoring reports on the lifetime ERR (88,775 vs 197,206 tCO₂e). Transparency is further limited by the absence of a verified ERR figure, an unquantified usage-monitoring method, and a grid emission factor drawn from 2010 data.
Red Flags
- Corrective action (CAR 1) in the 2012 verification report: Letters of Approval from the DNA of India had not been obtained at the time of verification.
- Lifetime ERR discrepancy: the 2016 monitoring report states 197,206 tCO₂e while the 2024 monitoring report states 88,775 tCO₂e — a difference of more than 50% with no documented explanation in the extracted record.
- Seven conditions listed (CL 1–CL 7) in the 2012 verification report cover missing DPR/hydrology data, unsubstantiated plant-load-factor assumptions, absent EIA evidence, and no evidence of stakeholder meetings.
- Grid emission factor of 854.7 g CO₂/kWh is sourced from 2010 data; no updated or reassessed baseline value is found in the extracted documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 37,998 | 0 | 37,998 | |
| 2016 | 197,204 | 0 | 197,204 | |
| Total | 235,202 | 0 | 235,202 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
Negligible, justified for hydro
Jurisdictional but 2010 grid EF, no reassessment date
Mentioned but FPIC/grievance not documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →