5.8/ 10
Integrity
6.0
Transparency
6.0
Claim Safety
5.0
Documentation
6.0

Audit Analysis

A 250 MW solar avoidance project in India's Pavagada Solar Park with a jurisdictional grid baseline and VVB-confirmed combined additionality test. The project is structurally sound but carries a significant data-reliability concern: the first four-month monitoring period reports roughly 7 times the pro-rata share of the seven-year ex-ante estimate, and the PDD contains incorrect GPS coordinates for all five sub-plants. No buffer pool exists under the CDM framework, and several safeguards details (FPIC, grievance mechanism) are absent from the extracted record.

Red Flags

  • The first monitoring period (Sep–Dec 2020, ~4 months) reports 157,936 tCO₂e, which is approximately 7.1× the pro-rata expectation of ~22,253 tCO₂e derived from the PDD's 467,318 tCO₂e seven-year total — a major internal inconsistency that undermines confidence in either the ex-ante estimate or the monitoring data.
  • The PDD lists identical GPS coordinates for all five sub-plants located in different villages, a material error flagged in the verification report and carried into two open corrective actions.
  • The source of data for the grid emission factor parameter (EGPJ,y) was found inconsistent with the actual monitoring procedure due to permanent changes, as noted in the verification report's material findings.
  • No buffer pool or permanence risk mechanism is in place; CDM does not require one, but this leaves no structural backstop against reversal or over-crediting.

Credit Vintages

IssuedRetiredAvailable
2022
143,8270143,827
Total143,8270143,827

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, low reversal risk

Leakage

0 % deemed negligible, reasonable for solar

Baseline

Jurisdictional grid EF (0.9419, 2019)

Safeguards

Mentioned but FPIC & grievance mechanism not detailed

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents