250 MW Solar PV Plant at Bhainsada, Rajasthan
GS-2572 ↗ · current registry ID: GS7727
#1067of 1935 in Renewable energy#548of 975 in India#764of 1801 in Gold Standard (GS)#838of 1287 in ACM0002
Audit Analysis
The 250 MW Bhainsada solar PV project has sound structural fundamentals — VVB-verified additionality, a jurisdictional baseline, and appropriate leakage treatment for a grid-displacement project — but is significantly undermined by 19 material findings, 14 corrective actions, and multiple cross-document contradictions that raise questions about the reliability of the monitoring and reporting process. The project delivered 5.74% below its ex-ante estimate for the monitoring period, which is within normal variance and suggests no over-crediting, but the documentation quality and data gaps (FNRB, usage rates, CORSIA/CCP status) limit confidence in the overall claim.
Red Flags
- 19 material findings and 14 corrective actions identified in the 2024 verification report, including inconsistent ER values, missing calibration certificates, and a wrongly calculated value in Section E.1 of the monitoring report
- Credit type is listed as 'Solar Thermal – Electricity' in the registry record while the project is a Solar PV plant, flagged as CAR 03 in the verification report
- min_extraction_confidence is rated 'low', indicating at least one key document was poorly readable, reducing confidence in the extracted data
- FNRB value, usage rate (assumed and verified), and CORSIA/CCP eligibility are all not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 370,921 | 250,915 | 120,006 | |
| 2023 | 572,469 | 0 | 572,469 | |
| 2024 | 144,032 | 0 | 144,032 | |
| Total | 1,087,422 | 250,915 | 836,507 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% justified as negligible for grid displacement
Jurisdictional baseline per 2024 report
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →