5.6/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A 27 MWp solar PV project in India with VVB-confirmed investment additionality and a recently reassessed (2025) project-specific baseline. The project overachieved its ex-ante emission reduction estimates by 16.48%, triggering capping at the +10% sensitivity bound, and generated 87 verification findings including multiple corrective action requests. Significant documentation gaps (low extraction confidence, nine cross-document contradictions, no verified ERR figure) and the absence of a buffer pool or explicit permanence treatment limit confidence in the credit's robustness.

Red Flags

  • Emission reductions exceeded the ex-ante estimate by 16.48%, breaching the +10% sensitivity analysis upper bound; 2,783 ERs remain pending subject to a temporary change determination
  • Nine contradictions identified across documents, including conflicting CORSIA eligibility (not eligible per 2024 verification vs. eligible per 2025 validation), conflicting baseline method (project vs. jurisdictional), and conflicting FPIC status
  • No buffer pool percentage stated and reversal events explicitly 'not addressed' in the verification report, leaving permanence risk unquantified
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, undermining data reliability
  • Meter calibration was delayed from December 2022 to February 2023, requiring application of a maximum permissible error factor of 0.2%

Credit Vintages

IssuedRetiredAvailable
2020
38,31938,183136
2021
37,63020,99516,635
2022
35,57410,00025,574
2023
35,35627,1268,230
2024
17,9906,61411,376
Total164,869102,91861,951

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversals not addressed

Leakage

0% deduction, deemed negligible (grid displacement)

Baseline

Project-specific; reassessed 2025

Safeguards

FPIC and grievance confirmed; benefit-sharing contradicted

Double-claim

CORSIA status contradicted; CCP not mentioned

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents