28MW Jinkouba Hydropower Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the validation report records no material findings.
missing Leakage is not addressed in the validation report, and reversal events are not addressed in the extracted record.
Transparency
verified The project has a named validation body and a defined monitoring period in the validation record.
missing Verified versus claimed emission reductions are not available in the extracted record, and the extraction confidence is low.
Claim Safety
verified The project uses ACM0002 under the CDM, which is a recognized methodology for grid-connected renewable power.
missing Leakage justification is missing in the validation report, and there is no evidence in the extracted record on CORSIA or CCP status.
Documentation
verified Multiple official documents were used, and the validation report is dated.
missing The extraction confidence is low, and there are contradictions on additionality test type, leakage treatment, and crediting period.
Detailed Analysis
Integrity
The validation report from TÜV NORD JI/CDM Certification Program confirms additionality through a combined test and reports no material findings or corrective actions. That said, leakage is not addressed in the validation report, reversal events are not addressed, and no buffer pool information is available, which weakens the permanence and leakage profile. The project is a hydropower avoidance project, so reversal risk is lower than for land-use projects, but the documentation still leaves important gaps.
Transparency
The project has a clear validation body and a stated monitoring period, which supports basic traceability. However, the extracted record does not provide claimed or verified emission reduction totals, usage monitoring details, or registry completeness indicators, so public MRV transparency appears limited. The low extraction confidence further reduces confidence that the available documentation is complete.
Claim Safety
Claim safety is moderate because the project uses a standard CDM methodology for renewable electricity and has VVB-confirmed additionality. Still, the absence of a documented leakage treatment in the validation report and the lack of evidence on CORSIA or CCP status leave residual over-crediting and dual-claim uncertainty. The later note that leakage was deemed negligible is less persuasive than the validation report’s explicit lack of treatment, so the more specific validation record was privileged.
Documentation
Documentation quality is mixed: there are multiple official documents and a dated validation report, but the extraction confidence is low and several key fields are missing. The record also contains contradictions on the additionality test type, leakage justification, and crediting period; the validation report was privileged because it is the primary certification document and is dated earlier than the conflicting later extract. These inconsistencies materially reduce confidence in the completeness and reliability of the file.
Overall
Overall, this is a mid-quality CDM hydro project with some credible integrity evidence but notable documentation and transparency weaknesses. The contradictions were handled by privileging the dated validation report over later conflicting extracts: it states a combined additionality test, while a later source suggests an investment test; it does not address leakage, while a later source calls it negligible; and it shows an earlier crediting period than the later extract. Because the validation report is the primary certification document, it was given more weight, but the inconsistencies and low extraction confidence still justify a conservative score.
Audit Analysis
This CDM hydropower project has some positive integrity signals, including VVB-confirmed additionality and no material findings in the validation report. However, key risk controls are weakly documented: leakage is not addressed in the validation record, reversal risk is not discussed, and the extraction confidence is low, which reduces trust in the completeness of the evidence.
Project Description
Status: Registered Type: PA Methodology: ACM2 Project type: Hydro Sub-type: Run of river Region: Asia & Pacific Sub-region: East Asia Reductions 1st period: 108.689 ktCO2e/yr
Red Flags
- Leakage treatment is not addressed in the validation report, while a later document reportedly described it as negligible; the more specific and dated validation report was privileged, but the inconsistency lowers confidence.
- The crediting period is inconsistent across documents, with the validation report showing one period and a later document showing a different one, which raises documentation reliability concerns.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 229,978 | 0 | 229,978 | |
| 2012 | 106,476 | 0 | 106,476 | |
| Total | 336,454 | 0 | 336,454 |
Cosa migliorerebbe questo punteggio
- Provide the full monitoring report and verification statement with claimed and verified issuance figures, leakage treatment, and any corrective action closure.
- Publish a clear registry trail and eligibility statement covering CORSIA/CCP status, plus a consistent crediting-period record across all official documents.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal treatment stated
Leakage not addressed
Project baseline stated, reassessment missing
FPIC noted, grievance mechanism not stated
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →