29.7 MW Wind Power project in Karnataka, India
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the validation report indicates a combined additionality test rather than no test at all.
missing The validation report records seven corrective actions, and leakage is not addressed there; the later claim of negligible leakage conflicts with the earlier document.
Transparency
verified The project has a named VVB, a defined monitoring period for 2011, and a clear CDM registry context.
missing Total ERs claimed and verified are not found in the extracted record, and the monitoring approach for usage and leakage is not stated.
Claim Safety
verified The project uses a project baseline under ACM 0002, which is at least a recognized CDM methodology framework.
missing Leakage treatment is unclear, and the record does not state CORSIA eligibility or CCP status, leaving dual-claim risk unresolved.
Documentation
verified The extraction draws on 12 documents, and the VVB is identified as Det Norske Veritas Certification AS.
missing The minimum extraction confidence is only medium, and the validation report is dated 2008 while the monitoring period is 2011, so the evidence set is incomplete and partly dated.
Detailed Analysis
Integrity
The validation report confirms additionality through a combined test and says the VVB verified it, which supports the project’s core crediting case. That said, the same report lists seven corrective actions, and leakage is not addressed there, so the integrity picture is weakened by unresolved methodological and reporting gaps. The later contradiction on leakage was not privileged over the validation report because the validation report is the primary approval document and is more directly relevant to project design claims.
Transparency
Transparency is moderate because the record identifies the VVB, the registry, and a specific 2011 monitoring period. But the extracted facts do not include claimed versus verified ER totals, nor do they state the usage monitoring method or any quantified leakage treatment. The absence of these details limits the ability to independently trace the issuance claim.
Claim Safety
Claim safety is constrained by the project-specific baseline and the lack of a stated leakage deduction. The record also does not state whether the project is CORSIA-eligible or CCP-approved, so dual-market claim risk cannot be ruled out from the available documents. Because the later document says leakage was negligible while the validation report says it was not addressed, I give priority to the validation report and discount the claim-safety score.
Documentation
The evidence base includes multiple documents and identifies the VVB, which is helpful. However, the minimum extraction confidence is only medium, and several key fields are missing or not stated, including buffer pool treatment, leakage quantification, and issuance totals. The validation report is also relatively old compared with the monitoring period, which reduces documentation completeness for assessing the credited period.
Overall
Overall, this is a mid-quality CDM wind project with a credible additionality signal but notable documentation and claim-quality weaknesses. I privileged the validation report over the later contradictory leakage statement because it is the primary project approval document and is more specific about the original design assessment. The contradictions on additionality test type and leakage treatment reduce reliability, but not enough to trigger the integrity gate that would cap the overall score.
Audit Analysis
This wind project has some positive integrity signals, including VVB-confirmed additionality and documented safeguards such as FPIC and a grievance mechanism. However, the record also shows multiple corrective actions, no stated leakage treatment in the validation report, and missing key monitoring details, which weakens confidence in the crediting claims.
Project Description
Status: Registered Type: PA Methodology: ACM2 Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 88.24 ktCO2e/yr
Red Flags
- The validation report lists seven corrective actions, indicating material documentation or methodology issues at validation.
- Leakage is not addressed in the validation report, and the later document suggesting it was negligible is contradicted by the earlier source.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 64,712 | 0 | 64,712 | |
| 2011 | 122,949 | 0 | 122,949 | |
| 2012 | 97,126 | 0 | 97,126 | |
| Total | 284,787 | 0 | 284,787 |
Cosa migliorerebbe questo punteggio
- Provide the monitoring report or issuance record showing claimed versus verified ER totals, leakage treatment, and any post-validation updates.
- Document a clear baseline reassessment history and explicit statements on CORSIA eligibility and CCP status to reduce dual-claim uncertainty.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal treatment stated
Leakage not addressed in validation
Project baseline, reassessment not stated
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →