3.0 MW BEL grid-connected wind power project at Somarigudda, Hassan district, Karnataka, India
#532of 1935 in Renewable energy#266of 975 in India#350of 1459 in CDM (UNFCCC)#188of 806 in AMS-I.D
Audit Analysis
A 3 MW grid-connected wind project in Karnataka validated under CDM AMS I.D v16 with a well-documented investment additionality test confirmed by TÜV NORD CERT. The baseline (jurisdictional grid EF of 0.9269) and 0% leakage treatment are appropriate for a grid-connected wind source, and permanence risk is inherently low. However, the extracted record contains no monitoring or verification data whatsoever, and the low extraction confidence limits confidence in the completeness of the available documentation.
Red Flags
- No monitoring or verification reports found in the extracted record despite the crediting period (2011–2021) having fully elapsed; actual credit issuance cannot be cross-checked against the 62,500 tCO2e ex-ante estimate
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the evidence base
- No Free, Prior and Informed Consent (FPIC) or grievance mechanism is documented in the available records
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test with CAPM benchmark
Avoidance project; no reversal risk for grid-connected wind
0% deduction; negligible for grid-connected source
Jurisdictional grid EF; reassessment timing not stated
Safeguards mentioned; no FPIC or grievance mechanism documen
CORSIA and CCP status not stated in available records
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →