3.0 MW Wind Power Project Activity by BVSR Constructions Private Limited
#472of 1935 in Renewable energy#242of 975 in India#306of 1459 in CDM (UNFCCC)#166of 806 in AMS-I.D
Audit Analysis
A straightforward 3 MW onshore wind project in India validated under CDM with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The claimed lifetime emissions reductions of 67,390 tCO₂ over the 10-year crediting period are consistent with a ~27 % capacity-factor assumption and the 2009 grid factor of 0.9445 tCO₂/MWh. However, no monitoring or verification reports were available in the extracted record, the extraction confidence is low, and safeguards documentation (FPIC, grievance mechanism) is absent, limiting the depth of assurance.
Red Flags
- No monitoring or verification reports found in the extracted record; actual emissions reductions cannot be confirmed against the 67,390 tCO₂ lifetime claim
- Low extraction confidence indicates at least one key document was poorly readable, reducing reliability of the extracted facts
- Contradiction in leakage treatment: the 2010 appendix describes leakage as 'quantified' while the 2012 validation report states it is 'deemed negligible' with a 0 % deduction
- No FPIC or grievance mechanism documented despite safeguards being mentioned in the validation report
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0 % deduction, appropriate for grid wind
Jurisdictional grid EF (2009)
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →