Skip to main content
CDMWindIndiaAMS-I.D

3.3 MW Wind Power Project by Classic Marble (EKIESL-CDM.December-14-01)

CDM-10248 ↗

#12of 1935 in Renewable energy#7of 975 in India#6of 1459 in CDM (UNFCCC)#7of 806 in AMS-I.D

7.1/ 10
Integrity
7.0
Transparency
7.0
Claim Safety
7.5
Documentation
7.0

Audit Analysis

A 3.3 MW wind project in India using the well-established AMS-I.D methodology with a jurisdictional grid baseline and VVB-confirmed investment additionality. The project delivered approximately 66% of its pro-rata ex-ante expectation over the monitoring period, indicating conservative crediting. Documentation is complete with all 12 corrective actions resolved, though FPIC and CORSIA/CCP status remain unconfirmed.

Red Flags

  • FPIC (Free, Prior, and Informed Consent) is not documented in any available record, leaving a gap in community engagement evidence
  • CORSIA eligibility and CCP status are not stated in any document, leaving dual-channel risk unassessed
  • A GSC comment alleging conflict of interest and professional misconduct by a consultant was raised during validation (though dismissed as unsupported)

Credit Vintages

IssuedRetiredAvailable
2021
24,169024,169
Total24,169024,169

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind – minimal reversal risk

Leakage

Negligible, justified for grid wind

Baseline

Jurisdictional grid EF (2014)

Safeguards

Grievance present; FPIC not documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents