3.5 MW Small Hydro Project In Himachal Pradesh
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test.
missing Leakage justification is not addressed in the monitoring report, and no leakage deduction is stated.
Transparency
verified The monitoring report and validation report provide a quantified verified emissions figure of 8,652 tCO2e for the monitoring period.
missing The monitoring report lists multiple missing supporting documents, including calibration certificates and invoices, which weakens MRV transparency.
Claim Safety
verified The project is a renewable small hydro activity under VCS with a VVB-verified monitoring claim.
missing The monitoring report does not address leakage, and the verified emissions figure changed materially from an earlier validation figure.
Documentation
verified The record includes a monitoring report, validation report, PDD, and issuance-related documentation, with high extraction confidence.
missing The monitoring report itself records several corrective actions and missing source documents, including technical equipment details and calibration certificates.
Detailed Analysis
Integrity
The project has a positive integrity signal because additionality was confirmed by the VVB through an investment test, and no reversal events are reported in the extracted record. However, the monitoring report says leakage was not addressed, and no leakage deduction is stated, which weakens the robustness of the crediting case. The baseline is project-specific rather than a clearly standardized or recently reassessed baseline, so the overall integrity case is only moderate.
Transparency
Transparency is mixed: the monitoring period and verified emissions are stated, and the VVB is identified as LGAI Technological Center S.A. (Applus+ Certification). At the same time, the monitoring report lists several missing supporting documents, including calibration certificates, invoices, and technical equipment details, and it notes inconsistencies in the MR template and date format. That reduces confidence in the completeness of the public MRV trail.
Claim Safety
Claim safety is moderate because the project is a renewable small hydro activity and the verified emissions claim is supported by a VVB. Still, the monitoring report leaves leakage unaddressed, and the record contains a major discrepancy in verified emissions between validation documents, with an earlier figure of 19,788 tCO2e and a later verified figure of 8,652 tCO2e. Because CORSIA eligibility and CCP status are not stated, dual-market risk cannot be ruled out from the extracted record.
Documentation
Documentation quality is fair overall because multiple core documents are present, including the PDD, validation report, monitoring report, and issuance-related material, and extraction confidence is high. But the monitoring report itself lists numerous corrective actions and missing evidence, such as calibration certificates, JMRs, invoices, and supporting breakdown documents. The crediting period is also much longer than the single monitoring period captured here, so the documentation set is not fully complete for a full-period assessment.
Overall
I privileged the later monitoring report and the later validation figure where contradictions existed, because they are more recent and more directly tied to the monitored issuance claim. Specifically, I treated leakage as not addressed because the monitoring report is the more recent and operationally relevant source, even though the PDD had described leakage as negligible, and I used the later verified emissions figure of 8,652 tCO2e rather than the earlier 19,788 tCO2e validation value. These contradictions reduce reliability, but they do not fully negate the project because additionality was VVB-confirmed and the registry status is registered.
Audit Analysis
This is a registered VCS small hydro project with VVB-verified additionality and no reported reversal events, but the leakage treatment is weak because the monitoring record says leakage was not addressed. The project has some safeguards documentation, yet the monitoring report also lists several missing supporting documents and corrective actions, which reduces confidence in the claimed emissions reductions.
Project Description
Proponent: Multiple Proponents Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 14462 tCO2e Region: Asia Registration date: 2020-08-23
Red Flags
- Leakage was marked as not addressed in the monitoring report, despite the PDD previously describing it as negligible.
- The verified emissions figure is inconsistent across validation documents, with 8,652 tCO2e ultimately verified versus an earlier 19,788 tCO2e figure.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 6,335 | 0 | 6,335 | |
| 2019 | 11,523 | 6,287 | 5,236 | |
| 2020 | 13,574 | 13,574 | 0 | |
| 2021 | 7,768 | 4,631 | 3,137 | |
| 2022 | 6,116 | 2,500 | 3,616 | |
| Total | 45,316 | 26,992 | 18,324 |
Cosa migliorerebbe questo punteggio
- Provide the missing supporting evidence for the monitoring period, including calibration certificates, invoices, JMRs, and technical equipment documentation.
- Clarify leakage treatment and reconcile the emissions discrepancy between the earlier validation figure and the later verified issuance claim.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project with no reversal events reported
Leakage not addressed in monitoring report
Project-specific baseline; reassessment not stated
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →