3.6MW Wind Power Project by M/s Hira Steels Ltd

CDM-4018 ↗

#38of 1935 in Renewable energy#24of 975 in India#25of 1459 in CDM (UNFCCC)#13of 806 in AMS-I.D

6.9/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

A 3.6 MW onshore wind project in India under CDM with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered approximately 121% of its pro-rata emission reduction expectation for the elapsed monitoring period, indicating no over-crediting risk. Initial documentation required seven corrective actions and three clarifications, all of which were resolved before issuance.

Red Flags

  • Seven corrective actions (CARs) and three clarifications (CLs) were raised during validation, including inconsistent investment decision dates, use of post-decision financial data, and inadequate QA/QC procedures — all resolved but indicating initial documentation quality issues
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Grid emission factor is from 2009; no evidence of periodic grid EF updates within the crediting period

Credit Vintages

IssuedRetiredAvailable
2016
15,174015,174
Total15,174015,174

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Jurisdictional grid-average baseline

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents