Audit Analysis
A 3 MW small-hydro project in India under VCS AMS I.D with a jurisdictional grid-emission-factor baseline and VVB-confirmed investment additionality. The verified emissions reductions (58,694 tCO₂e) match the claimed figure for the 2018–2022 monitoring period, and no reversal events or corrective actions were reported. Main concerns are the use of a 2017 grid emission factor for a monitoring window extending to 2022, minor operational deviations noted in the verification report, and the absence of CORSIA/CCP eligibility statements.
Red Flags
- Grid emission factor of 0.9462 tCO₂/MWh is from 2017, yet the monitoring period extends to February 2022; if India's grid has decarbonised, credits may be slightly over-estimated for the later years of the period.
- The validation report (2018) characterises the baseline as 'project' while the later monitoring report (2022) calls it 'jurisdictional' — a terminological inconsistency that, while likely reflecting the same grid-EF approach, introduces ambiguity about baseline robustness.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 10,197 | 9,882 | 315 | |
| 2017 | 14,189 | 2,921 | 11,268 | |
| Total | 24,386 | 12,803 | 11,583 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deemed negligible, justified
Jurisdictional EF, 2017 vintage
Grievance mechanism present, FPIC not stated
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →