3 MW Hydro Power Project by Oreva Energy Pvt. Ltd
#909of 1935 in Renewable energy#456of 975 in India#638of 1459 in CDM (UNFCCC)#296of 806 in AMS-I.D
Audit Analysis
A 3 MW CDM small-hydro project in India with a confirmed investment-test additionality assessment and a named VVB, but undermined by significant contradictions in ERR figures and baseline methodology across documents. The absence of a buffer pool, a 0% leakage deduction justified only as 'deemed negligible,' and unresolved discrepancies between the PDD, monitoring report, and validation reports create meaningful over-crediting and data-reliability risk.
Red Flags
- ERR figures are materially inconsistent across documents: the PDD (2016) claims 13,515 tCO₂e over the full crediting period while the monitoring report (2014) claims 26,492 tCO₂e for the same period, and the 2016 validation report verifies 31,032 tCO₂e — a pro-rata ratio of roughly 9× the PDD expectation for the elapsed monitoring window, raising serious over-crediting concerns.
- Baseline methodology is contradictory: the monitoring report (2014) describes a jurisdictional baseline while the 2016 validation report describes a project-specific baseline, leaving the actual baseline construction ambiguous.
- No buffer pool or permanence mechanism is documented for a project whose crediting period runs to 2022, and no reversal events are confirmed absent.
- Five Corrective Action Requests during verification (corrections to calorific value, diesel emission factor, data sources, calibration frequency, and PLF) indicate the initial monitoring plan contained material errors.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 31,032 | 0 | 31,032 | |
| Total | 31,032 | 0 | 31,032 |
Risk Indicators
Investment test, VVB-confirmed
reversal risk unaddressed
0% deduction, 'deemed negligible' without quantification
Method contradictory across documents; grid EF from 2009
Safeguards and benefit-sharing mentioned; FPIC and grievance
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →